Skip to main content

China’s CMBE wins Padmar bridge, Bangladesh build contract

China Major Bridge Engineering Company (CMBE) has won the US$1.55 billion contract to build the main structure of Bangladesh's Padma bridge. A 100-year guarantee will be provided by CMBE for the 10km long 25m wide bridge as part of the contract secured from the Bangladeshi government. According to Bangladesh's Finance Minister Ama Muhith, a formal agreement will be signed with CMBE at some stage in June 2014. Around 6.15km of Padma bridge will be constructed over Padma river, with the remainder built on
May 28, 2014 Read time: 1 min
China Major Bridge Engineering Company (CMBE) has won the US$1.55 billion contract to build the main structure of Bangladesh's Padma bridge.

A 100-year guarantee will be provided by CMBE for the 10km long 25m wide bridge as part of the contract secured from the 1043 Bangladeshi Government.

According to Bangladesh's Finance Minister Ama Muhith, a formal agreement will be signed with CMBE at some stage in June 2014.

Around 6.15km of Padma bridge will be constructed over Padma river, with the remainder built on both banks.

For more information on companies in this article

Related Content

  • New Penang Bridge takes shape
    April 10, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • New Penang Bridge takes shape
    May 9, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • New bridge link for Tanzania
    March 21, 2012
    A new bridge costing over US$136 million will improve transport links in Tanzania. The 680m cable-stayed bridge will be built by China Major Bridge Engineering Company (CMBE) and Chinese Railway Construction Engineering Group (CRCEG).