Skip to main content

China helps Nepal plan capital ring road upgrade

China is providing technical assistance for the upgrading of the 27km ring road project for Nepalese capital Kathmandu.
February 24, 2012 Read time: 2 mins
China is providing technical assistance for the upgrading of the 27km ring road project for Nepalese capital Kathmandu. 2719 Chinese Government officials have conducted a visit to Nepal to carry out a technical study into the project. The existing ring road features four lanes, with two in either direction and the upgrade to the route will see it widened to four lanes in either direction. A Chinese technical team is carrying out the detailed study into the first 9.5km section of the ring road upgrade as well as surveying materials needs. The study follows an earlier agreement struck between the Chinese and Nepalese Governments over the upgrade work. Meanwhile the Nepalese Government is direction operations on the new road that will connect the country with Fallak in China and Bhiddamode in India's Bihar State. This road will run from Lamabagar in Nepal's Dolakha District, which borders with China in the north all the way to Jaleswor in Dhanusa, which borders with India in the south. The road will be the shortest route connecting China and India through Nepal and will be 250km long. Nepal's 2437 Ministry of Physical Planning and Works says that the road will help boost tourism and business and is a government priority as part of its open border programme with its neighbours. A further 50km of the road still needs to be complete while a bridge is under construction in Khurkot. Construction work on the bridge will be completed within 12 months with the work being funded by the ADB. Once the new road is open it will improve capacity and reduce travel times compared to the existing route.

For more information on companies in this article

Related Content

  • Nepal's ring road future
    February 8, 2012
    Plans are in hand for upgrades to the existing ring road around Nepal's capital Kathmandu. This 28km route will be widened to cope with the growing traffic volumes and high congestion levels seen at present and the work is expected to cost US$55 million.
  • Nepal sets major infrastructure programme in motion
    February 15, 2012
    The Nepalese Government is setting out a strategy to invest heavily in its transport connections. The country has set a budget of US$5.49 billion for the fiscal year 2011-2012, with $530 million to be spent on the infrastructure development programme.
  • New Zimbabwe highway upgrade being planned
    August 24, 2016
    Plans are in hand for road widening work and surfacing upgrades for a key route crossing Zimbabwe. The highway upgrade is being carried out by a joint venture partnership between Chinese firm China Harbour Engineering Company (CHEC) and Austrian Company Geiger International. This follows agreements being reached between the joint venture partners and the Zimbabwe Government. The work is needed as the existing road links along the route are unable to cope with that current traffic volumes that include a high
  • New highway for Nepal
    August 16, 2012
    A new stretch of highway is now open to traffic in Nepal. The Nepalthok-Khurkot Road recently had its official opening. Some US$46.2 million was spent on the section of highway, with much of the funding being provided by the Japanese Government. The Nepalthok-Khurkot section of road forms part of a larger project and is Phase 3, Part-I of the Banepa-Sindhuli-Bardibas BP highway.