Skip to main content

Chile’s road development work continues

Chile’s ambitious road development programme is continuing. Work is starting on the Americo Vespucio Oriente (AVO 1) highway project. This is expected to cost US$926 million and will provide an improved connection from the El Salto area to Principe de Gales. The work should be completed in the second half of 2021. However a number of complaints have been made with regard to the project, which could delay the timeframe once more. The project was originally due to open for traffic in 2020. Meanwhile Chile’s
February 6, 2018 Read time: 2 mins

Chile’s ambitious road development programme is continuing. Work is starting on the Americo Vespucio Oriente (AVO 1) highway project. This is expected to cost US$926 million and will provide an improved connection from the El Salto area to Principe de Gales. The work should be completed in the second half of 2021. However a number of complaints have been made with regard to the project, which could delay the timeframe once more. The project was originally due to open for traffic in 2020.

Meanwhile Chile’s Ministry of Public Works of Chile is delayed the deadline for the bidding process for the project to upgrade the 138km Camino de La Fruta road to 8th March 2018. The route will pass through six districts in the regions of Valparaiso and O'Higgins and the project is expected to cost $600 million.

And there is concern over plans for a new link joining Route 78 and Route 68. Just one bid was received for the 45 year concession, from Grupo Costanera.

Related Content

  • Paraguay to invest US$500mn in roads during 2014
    January 21, 2014
    Paraguay’s Ministry of Public Works and Communications (MOPC) is this year said to be planning to invest US$500 million in the South American country’s roads. The figure is said to be part of a proposed infrastructure investment of $7.66 billion for the period 2013-2016. Among the 2014 road projects will be the estimated $84.46 million repair of Route 8 -72.9kms – put out to tender by the MOPC in December 2013. All bids must be submitted on 29 January 2014. Route number 9 -Transchaco- between Mariscal Est
  • Colombian highway connection being built
    March 27, 2019
    Construction work is well underway for Colombia’s Autopista Mar 1 motorway project. The route is due for completion in 2022, connecting the country’s Caribbean and Pacific coasts through Medellin. The project includes construction of the Tunel de Occidente. A finance package worth US$713 million in the shape of loans from eight banks is helping fund the project. Work is also ongoing for the Conexio Norte routelinking Remedios with Caucasia. This project should be complete by 2021. Meanwhile the Via del Nu
  • Spanish highway project to get EIB A-rated bond issue?
    April 20, 2012
    The European Investment Bank (EIB) is reported to be in talks with the sponsors of the A-66 Benavente-Zamora highway public private partnership (PPP) in Spain over a possible bond financing deal, which would see the Bank provide subordinated debt for an A-rated bond issue. The possible bond issue would be a further greenfield project to launch the European Union’s Project Bond 2020 initiative, with its initial pilot stage being managed by the EIB.
  • Ethiopia’s challenging cement market: consumption stimulation
    January 26, 2018
    Ethiopia’s cement industry has enjoyed substantial growth in the past decade. However, challenges linked to the government’s investment policy could erode these gains, as Shem Oirere reports With nearly 16.5 million tonnes of cement capacity and 10% average growth in annual consumption, Ethiopia is among the top cement producers in sub-Saharan Africa. Only Nigeria and South Africa rival it.