Skip to main content

Chile’s Chacao Bridge under construction

Construction work on Chile’s Chacao Bridge project is now underway. The 2.75km suspension bridge will connect the Chilean mainland with Chiloe Island. The bridge structure has been designed to flex so that It can cope with severe earthquakes, which present a risk in the area. The project is costing US$700 million to carry out with South Korean company Hyundai heading the construction. Building the link should take around five years with its completion set for 2023, although the work could be finished earlie
March 6, 2018 Read time: 2 mins
Construction work on Chile’s Chacao Bridge project is now underway. The 2.75km suspension bridge will connect the Chilean mainland with Chiloe Island. The bridge structure has been designed to flex so that It can cope with severe earthquakes, which present a risk in the area. The project is costing US$700 million to carry out with South Korean company 236 Hyundai heading the construction. Building the link should take around five years with its completion set for 2023, although the work could be finished earlier if productivity targets are achieved.


The project to build a bridge to link Chiloe Island with mainland Chile has been planned for some time. However an earlier design was rejected as being too costly by the then 968 Chilean Government and any progress was then halted. This present design represents a substantial change from the original plan and the project has also benefited from a different funding package as well as a change in the Chilean Government.

Once the bridge opens to traffic it will replace a ferry service that connects with Chiloe Island at present. Journey times will be reduced from 30-45 minutes at present using the ferry service to just 2-3 minutes across the tolled bridge. The bridge project is intended to boost the economy of Chiloe Island and will help develop tourism in the area.

For more information on companies in this article

Related Content

  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load
  • New section planned for the Pennsylvania Turnpike
    March 27, 2020
    A new stretch of road is needed for the Pennsylvania Turnpike.
  • Mexico: underwater tunnel in Latin America
    May 8, 2015
    Mexico will benefit from an important new underwater tunnel - Mauro Nogarin writes. The city of Coatzacoalcos is located at the mouth of the river of the same name, in the Gulf of Mexico, 302km from the city of Salina Cruz, Oaxaca, in the east end of trans-isthmian corridor and at the southern end of Veracruz State. The city is seeing a key development as currently construction is 85% completed on the first immersed tube, underwater tunnel in Latin America. The reasons why experts chose this type of tunne
  • India pushing ahead with infrastructure projects
    July 4, 2012
    Despite the economic downturn, India looks to be pressing ahead with its major infrastructure projects to further boost its incredible growth. Patrick Smith reports India, which like most countries has been affected by the current economic climate, although not to the same extent, is pressing ahead with its ambitious highway construction plans. Each week new projects are completed, started or awarded as the nation seeks to improve its transportation requirements. These are needed to meet the aspirations of