Skip to main content

Chile highway project delayed for investigation

Construction work on the Americo Vespucio Oriente (AVO) highway in Chile should start soon. This will commence once the environmental impact assessment has been completed. There has been a delay as the environmental impact assessment into the first section of the highway was halted. Allegations were made concerning irregularities over this portion of the work.
April 25, 2017 Read time: 1 min

Construction work on the Americo Vespucio Oriente (AVO) highway in Chile should start soon. This will commence once the environmental impact assessment has been completed. There has been a delay as the environmental impact assessment into the first section of the highway was halted. Allegations were made concerning irregularities over this portion of the work.

Related Content

  • Costa Rica to replace Conavi with a National Infrastructure Institute
    March 14, 2016
    Amid concerns over the efficiency of Costa Rica’s highways agency Conavi, the authority has been given more time to provide details on expansion of Route 32, according to the La Republica newspaper. Conavi has been at loggerheads with the Treasury Inspector's Office which wants Conavi to move faster and authorise a contract for the expansion of road between Rio Frio and Limon granted to China Harbour Engineering Company. China Harbour has been requesting further details about the US$395 million projec
  • Bridge collapse disaster in Baltimore
    March 26, 2024
    A ship collision has caused a highway bridge collapse in Baltimore.
  • Kenyan capital’s key connection construction contract cost climbs
    February 27, 2018
    The project to build the new highway link from Kenya’s capital Nairobi to the city’s Jomo Kenyatta International Airport (JKIA) is now expected to cost US$579 million. This represents an increase of around $206 million from the pricetag originally expected for the link. This cost increase comes despite a substantial change in the design, with the route now featuring a series of flyover sections and underpasses, instead of being elevated along its 43.5km length as originally proposed. This redesign will
  • Polish road dispute
    February 28, 2012
    A string of legal and political battles look likely in the aftermath of a broken highway contract in Poland.