Skip to main content

Chile highway project delayed for investigation

Construction work on the Americo Vespucio Oriente (AVO) highway in Chile should start soon. This will commence once the environmental impact assessment has been completed. There has been a delay as the environmental impact assessment into the first section of the highway was halted. Allegations were made concerning irregularities over this portion of the work.
April 25, 2017 Read time: 1 min

Construction work on the Americo Vespucio Oriente (AVO) highway in Chile should start soon. This will commence once the environmental impact assessment has been completed. There has been a delay as the environmental impact assessment into the first section of the highway was halted. Allegations were made concerning irregularities over this portion of the work.

Related Content

  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Chile highway link faces future issues
    January 24, 2017
    Chile’s busy Route 68 between capital Santiago and the country’s main port of Valparaiso faces an uncertain future. The 110km highway carries heavy traffic volumes and is close to its capacity of 4,500 vehicles/hour at peak periods, with extensive works required to improve the route. The work to upgrade Route 68 is expected to cost up to US$170 million, with eight sections of the highway in particular need of attention. The tender process for the upgrade work will open shortly. The Chilean Government opt
  • Bridge collapse on key I-5 route in Washington State
    June 24, 2013
    The news that a key highway bridge has collapsed in the US comes as gloomy reading for all in the highway sector. When a section of the Interstate 5 Bridge over the Skagit River in Washington failed in May 2013, a number of vehicles were plunged into the river. Luckily no-one was killed in the incident on the route, which is one of the main links between the US and Canada, and the parallel bridge was able to carry traffic, albeit with delays for users.
  • Algeria East-West Highway opening due
    September 9, 2015
    The long running saga of Algeria’s East-West Highway should come to a key point soon, when most of the route will finally be open to traffic. The 1,216km-long route will be fully operational at the end of October 2015. This is of course with the exception of the Lakhdaria section, which still requires rehabilitation work to be carried out. The repairs are expected to carry on until May or June 2016. Contractors from all over the world have been involved in the East-West highway project but certain stretches