Skip to main content

Chile highway project delayed for investigation

Construction work on the Americo Vespucio Oriente (AVO) highway in Chile should start soon. This will commence once the environmental impact assessment has been completed. There has been a delay as the environmental impact assessment into the first section of the highway was halted. Allegations were made concerning irregularities over this portion of the work.
April 25, 2017 Read time: 1 min

Construction work on the Americo Vespucio Oriente (AVO) highway in Chile should start soon. This will commence once the environmental impact assessment has been completed. There has been a delay as the environmental impact assessment into the first section of the highway was halted. Allegations were made concerning irregularities over this portion of the work.

Related Content

  • Slovakian highway projects delayed
    May 13, 2021
    Two Slovakian highway projects are now delayed.
  • Chile highway link project for Valdivia
    June 26, 2017
    New dual carriageway connections are to be built in Chile to join the town of Valdivia to the Ruta 5 highway. The work is expected to cost US$250 million in all, with the work being planned by Chile’s Ministry of Public Works (MOP) and construction due to start in 2021.
  • Chile highway link project for Valdivia
    June 26, 2017
    New dual carriageway connections are to be built in Chile to join the town of Valdivia to the Ruta 5 highway. The work is expected to cost US$250 million in all, with the work being planned by Chile’s Ministry of Public Works (MOP) and construction due to start in 2021.
  • The world’s longest suspension bridge
    June 24, 2024
    The world’s longest suspension bridge is the 1915 Çanakkale Bridge in Turkey. This engineering marvel links Gelibolu with Lapseki, forming a key section of the 101km highway linking Malkara with Çanakkale. *Article produced in partnership with the General Directorate of Highways (KGM), Ministry of Transport and Infrastructure, Republic of Türkiye.