Skip to main content

Chile highway project delayed for investigation

Construction work on the Americo Vespucio Oriente (AVO) highway in Chile should start soon. This will commence once the environmental impact assessment has been completed. There has been a delay as the environmental impact assessment into the first section of the highway was halted. Allegations were made concerning irregularities over this portion of the work.
April 25, 2017 Read time: 1 min

Construction work on the Americo Vespucio Oriente (AVO) highway in Chile should start soon. This will commence once the environmental impact assessment has been completed. There has been a delay as the environmental impact assessment into the first section of the highway was halted. Allegations were made concerning irregularities over this portion of the work.

Related Content

  • Tunnel delays in Czech link
    February 27, 2012
    Drilling work on the Blanka road tunnel in Czech capital Prague has now been completed.
  • Transforming Algeria's road network
    February 9, 2012
    Highway construction work is transforming Algeria, providing the country with a new network of highway quality road connections.
  • Transforming Algeria's road network
    April 4, 2012
    Highway construction work is transforming Algeria, providing the country with a new network of highway quality road connections. Several sections of the new trans-Algerian highway are already complete and carrying traffic, such as the stretch near the town of Setif. When complete the highway will run 1,200km across the north of the country from the border with Morocco in the west to the Tunisian border, passing through 24 provinces. This makes it the biggest highway project ever undertaken in Africa, as wel
  • Tougher sign from SignPost Solutions
    May 20, 2016
    SignPost Solutions claims that its Signstr8 product is an innovative, anti-rotational signpost that is highly resistant to crash damage and vandalism. The Signstr8 sign post can be made from either steel or aluminium, and outwardly looks like any other sign post. It uses standard fixings and a cap on the top. The difference is that Signstr8 has a designed-in flat portion so that once installed the sign is fixed and cannot be twisted around the post. This means that the signs will always have the corr