Skip to main content

Chile highway project delayed for investigation

Construction work on the Americo Vespucio Oriente (AVO) highway in Chile should start soon. This will commence once the environmental impact assessment has been completed. There has been a delay as the environmental impact assessment into the first section of the highway was halted. Allegations were made concerning irregularities over this portion of the work.
April 25, 2017 Read time: 1 min

Construction work on the Americo Vespucio Oriente (AVO) highway in Chile should start soon. This will commence once the environmental impact assessment has been completed. There has been a delay as the environmental impact assessment into the first section of the highway was halted. Allegations were made concerning irregularities over this portion of the work.

Related Content

  • Chinese highway project underway
    January 27, 2021
    An important Chinese highway project is being built.
  • Chile’s crowded roads face further congestion
    June 21, 2017
    Road congestion is a growing problem in Chile as the country’s vehicle fleet is fast outstripping road capacity. In 15 of the county’s major urban areas, the vehicle fleet is growing 10 times quicker than the rate of road construction.
  • New EU-Russian highway connection
    February 18, 2013
    Among the forests and lakes of Finland, one of Europe's newest motorway links is being built as a Green highway linking Europe to Russia - Adrian Greeman reports The road eastwards from Finland's capital Helsinki, along the north coast of the Gulf of Finland, has not carried heavy traffic volumes, at least until recent times. Highway seven as it is designated locally, or E18 in European nomenclature, is partly motorway but in some sections still dual carriageway or even just a single lane each way, finishin
  • Construction materials and road design in East Africa
    June 25, 2013
    An envisaged shortage in the supply of angular rock or crushed stone in Tanzania and a determination to conserve the environment by Kenyan authorities dictated the engineering design of a multi-national road linking the two largest economies in Eastern Africa. Shem Oirere reports The cost of buying crushed stone or hiring a site for mining the material and the expenses of moving it from the crushing site to the project area, saw designers opt for an intermediate alignment and discarding of the inner and out