Skip to main content

Chile considering bridge monitoring options

In the wake of bridge collapses in Chile, the authorities are considering options for structural monitoring systems. A tender has been opened for an effective monitoring system that could be used to check the condition of bridges or tunnels or other civils structures. An effective monitoring technology is required as Chile’s Ministry of Public Works has revealed that 14 of the country’s bridges are in a critical condition with a further 245 requiring improvement works within the next 24 months. Three bids f
July 5, 2019 Read time: 1 min

In the wake of bridge collapses in Chile, the authorities are considering options for structural monitoring systems. A tender has been opened for an effective monitoring system that could be used to check the condition of bridges or tunnels or other civils structures. An effective monitoring technology is required as Chile’s Ministry of Public Works has revealed that 14 of the country’s bridges are in a critical condition with a further 245 requiring improvement works within the next 24 months. Three bids for monitoring systems have so far been received.

Related Content

  • Airport preparation through compaction
    April 12, 2018
    Two major airport projects around the world are being constructed on poor ground and have required extensive compaction - Mike Woof writes With air travel continuing to increase around the world, airport capacity is being upgraded in many major cities. Two of the world’s largest mega cities, Beijing and Istanbul, are constructing new airports to cope with growing demand. This is because the existing facilities are simply unable to cope with projected growth for aviation and some of the airports are alrea
  • Italian bridge monitoring project
    May 25, 2020
    A monitoring project has been awarded for Italy’s Genoa bridge.
  • Delay possible for Chile-Argentina tunnel project
    May 10, 2018
    Delays may be a possibility for the construction of the Agua Negra Tunnel, which will run through the Andes mountain range and connect Argentina and Chile. The tendering process is being held back while further geological studies are carried out. An analysis of the initial geological work carried out so far for the project has highlighted a number of discrepancies with the information gathered. It is known that there are three main fault lines cutting across the intended tunnel route however. The tunnel
  • Germany plans replacement for A40 Neuenkamp Duisburg Bridge
    March 6, 2018
    Germany’s motorway authority has unveiled plans for an 802m cable stayed replacement bridge taking the A40 over the Rhine River near Duisburg. The state owned authority Deges - Deutsche Einheit Fernstraßenplanungs- und -bau - will oversee the project that includes an eight-lane expansion of the A40, all in the industrial Rhur region.