Skip to main content

Chile bridge project under control

The project to build the Chacao Bridge in Chile will now be managed fully by South Korean Contractor Hyundai. The firm formed a consortium, Consorcio Puente Chacao, with Brazilian contractor OAS to build the bridge. However OAS later hit financial issues, so Hyundai has now assumed full control of the project. The new bridge will connect the mainland with Chiloe Island and will be designed to cope with potentially extreme conditions. The area has suffered some of the most powerful earthquakes ever recorded
November 15, 2017 Read time: 1 min
The project to build the Chacao Bridge in Chile will now be managed fully by South Korean Contractor Hyundai. The firm formed a consortium, Consorcio Puente Chacao, with Brazilian contractor OAS to build the bridge. However OAS later hit financial issues, so Hyundai has now assumed full control of the project. The new bridge will connect the mainland with Chiloe Island and will be designed to cope with potentially extreme conditions. The area has suffered some of the most powerful earthquakes ever recorded so the bridge will be a suspension type able to move without damage in the event of any major shocks.

Related Content

  • Trends in compaction machine technology
    February 20, 2012
    More efficient and productive compaction solutions are coming to market shortly, Mike Woof reports. Several key trends are emerging in the asphalt compaction market with the development of the latest generation machines. Performance and productivity remain key issues for compactor manufacturers with firms keen to maximise output from their latest units.
  • Czech bridge facing demolition over condition concerns
    October 29, 2018
    A bridge located in Prague, capital of the Czech Republic, is facing calls for its demolition. Concern has been expressed over the condition of the Hlavka Bridge, which spans the Vltava River. The bridge carries heavy vehicle traffic as well as trams and is one of the city’s major transport arteries. It was built originally from 1909 to 1912, replacing an earlier wooden structure. It was then rebuilt so as to cope with vehicle traffic and at present carries up to 100,000 vehicles/day, making it one of the b
  • Presidio Parkway: the Golden Gate Bridge’s new southern approach road
    May 29, 2013
    Work on the Presidio Parkway, a new breathtaking and eco-friendly southern approach road to San Francisco’s Golden Gate Bridge, has entered its crucial second and final phase. As Guy Woodford reports, the vital US$1 billion project has overcome legal as well as environmental challenges to stay on course for its expected 2016 completion Just after 9pm on Friday April 27, 2012 a large public crowd looked on excitedly as a fleet of more than 40 R&L Brosamer and Ferma Corporation deployed hydraulic demolition h
  • Efficient asset management to trim maintenance budgets
    January 22, 2014
    Transport infrastructure is taken for granted in many, if not most, developed countries. This has resulted in a shortage of investment in maintenance, posing potential long term cost issues. In many developing nations transport networks are expanding fast, but insufficient thought is also being given to how these will be maintained.