Skip to main content

Chile bridge design unveiled

The final design of Chile’s Chacao Bridge has now been revealed. This project is expected to cost in the order of US$700 million. The initial design was unveiled in 2015 but was then subject to a number of modifications to better meet requirements. South Korean company Hyundai is playing a central role in the consortium that will build the project although its partners for the work have yet to be finalised. Plans to build a bridge connecting Chiloe Island to the Chilean mainland have been discussed for some
June 27, 2016 Read time: 2 mins
The final design of Chile’s Chacao Bridge has now been revealed. This project is expected to cost in the order of US$700 million. The initial design was unveiled in 2015 but was then subject to a number of modifications to better meet requirements. South Korean company Hyundai is playing a central role in the consortium that will build the project although its partners for the work have yet to be finalised. Plans to build a bridge connecting Chiloe Island to the Chilean mainland have been discussed for some years, with the project having been cancelled previously on grounds of cost. The present administration committed itself to the bridge project going ahead, with the aim of boosting development in the country’s southern region. The new bridge will allow vehicle speeds of up to 100km/h and will cut journey times considerably for drivers as it will take the place of the ferries crossing the Chacao Channel at present. The bridge will be 2.6km long and its design and construction will have to take into account the earthquakes that occur in the area.

Related Content

  • Chinese mega tunnel project planned
    October 20, 2017
    Plans are being drawn up in China for a new mega tunnel project in Guangdong Province. Details of the project, to connect Shenzhen and Zhongshan, have been released by the official Chinese news agency Xinhua. The 6.8km undersea stretch of tunnel will carry eight lanes, making it the world’s widest undersea road tunnel.
  • Mexican bridge celebration
    March 22, 2012
    Mexico’s president Felipe Calderon has inaugurated the new Baluarte Bridge, which crosses the Baluarte River in the Sierra Madre mountain range in the north of the country. This 1.12km long bridge is 403m high at its central point over the steeply sloping ravine it spans, making it the highest cable-stayed structure in the world.
  • Kosovan highway ahead of schedule
    April 25, 2012
    In Kosovo, work is pushing ahead of schedule on the Route 7 highway to link capital Pristina with the Albanian border. Sections of the 120km highway have been opened, one year ahead of schedule. An official opening of several sections of the highway has been carried out by Kosovan leaders, including Prime Minister Hashim Thaçi, President Atifete Jahjaga, and members of Parliament, along with Albanian Prime Minister Sali Berisha and US representatives Eliot Engel (D- NY) and Gary Peters (D-MI) joined thousan
  • STRABAG sees profits grow
    April 29, 2016
    Construction company STRABAG has seen its financial performance improve during the 2015 financial year. The firm’s earnings before interest and taxes (EBIT) reached €341.04 million, an increase of 21% over the previous year. Double-digit growth was also achieved in net income (after minorities), with a gain of 22% to €156.29 million, while earnings/share grew from €1.25 to €1.52. These developments have compelled the management board to propose to the AGM planned for June 2016 a dividend of €0.65, which wil