Skip to main content

Chile bridge design unveiled

The final design of Chile’s Chacao Bridge has now been revealed. This project is expected to cost in the order of US$700 million. The initial design was unveiled in 2015 but was then subject to a number of modifications to better meet requirements. South Korean company Hyundai is playing a central role in the consortium that will build the project although its partners for the work have yet to be finalised. Plans to build a bridge connecting Chiloe Island to the Chilean mainland have been discussed for some
June 27, 2016 Read time: 2 mins
The final design of Chile’s Chacao Bridge has now been revealed. This project is expected to cost in the order of US$700 million. The initial design was unveiled in 2015 but was then subject to a number of modifications to better meet requirements. South Korean company Hyundai is playing a central role in the consortium that will build the project although its partners for the work have yet to be finalised. Plans to build a bridge connecting Chiloe Island to the Chilean mainland have been discussed for some years, with the project having been cancelled previously on grounds of cost. The present administration committed itself to the bridge project going ahead, with the aim of boosting development in the country’s southern region. The new bridge will allow vehicle speeds of up to 100km/h and will cut journey times considerably for drivers as it will take the place of the ferries crossing the Chacao Channel at present. The bridge will be 2.6km long and its design and construction will have to take into account the earthquakes that occur in the area.

Related Content

  • Work starting on second Chesapeake Tunnel project
    September 20, 2017
    Work is now starting on a major tunnel project in the US state of Virginia. Construction of a second tunnel connection for the Chesapeake Bay is expected to cost US$756million. The original Chesapeake Bay Tunnel and Bridge crossing opened to traffic in April 1964 and measures just over 37km long. Construction of a second parallel bridge was commenced in 1995 and opened to traffic in 1999. However the central tunnel link was not widened at that time and now carries more traffic than it was designed for, whil
  • New Turkish bridge opens to traffic
    June 30, 2016
    Turkey’s new Osman Gazi Bridge has now opened for traffic. This bridge can carry 40,000 vehicles/day, while halving the travel time needed using previous routes. This is a six lane suspension bridge measuring 3km and spanning the Sea of Marmara. Construction has taken 42 months and the structure has been designed to cope with the risk of earthquakes. The project has been co-ordinated by Japanese construction company IHI, with Siemens handling the role of electro and mechanical contractor. Siemens has dev
  • Dressta’s new dozers part of ambitious growth vision
    May 13, 2015
    Earthmoving equipment manufacturer Dressta is launching the first of three new hydraulic crawler dozers later this year, and has ambitious growth plans funded by parent company LiuGong, the Chinese construction equipment manufacturing giant. Guy Woodford reports Dressta’s trio of new hydraulic crawler dozers represent exciting additions to the dozer market and are the first results of parent company LiuGong’s significant R&D investment in the Polish firm, which it bought in 2012. Being launched in Q
  • US road safety is a cause for concern
    September 6, 2021
    There is concern over a worrying trend in US road safety, while there have been steady gains in road safety in Europe