Skip to main content

Canada's new bridge?

Plans are in hand in Canada for a replacement for the Pattullo Bridge.
February 29, 2012 Read time: 1 min
Plans are in hand in Canada for a replacement for the Pattullo Bridge. The current bridge link is ageing and a study has discounted a refurbishment of this structure as not being technically feasible. The bridge crosses the Fraser River and it is hoped that the replacement will be ready by 2020. Various alternatives have been evaluated and a new bridge is considered the most likely. The construction of a new six-lane bridge would cost US$1.03 billion. However, the new bridge might feature four lanes in a bid to cut costs. It is not yet clear whether the bridge would be tolled.

Related Content

  • SSL hits back over criticism of its work on the Champlain Bridge
    December 11, 2017
    The contactor building the replacement Champlain Bridge in Canada has hit back over of allegations of poor workmanship in the US$3.3 billion project. The new 3.4km cable-stayed Champlain Bridge over the St Lawrence River will have six lanes vehicle lanes and a separate cycle and pedestrian lane. Design life is 125 years and is being constructed under a public-private partnership and operating contract of 30 years after completion of construction. Work includes construction of a smaller bridge for Île des
  • Cleveland Bridge UK’s A14 work shortlisted
    July 15, 2020
    The showpiece bridge for A14 project is the 750m-long viaduct over River Great Ouse.
  • Contracts for $1.9 billion Francis Scott Key bridge
    February 27, 2025
    Key contracts have been awarded for the $1.9 billion Francis Scott Key bridge.
  • Indeco cuts up New York City’s old Kosciuszko Bridge
    November 23, 2017
    An Indeco ISS 45/90 is proving essential for demolishing the old Kosciuszko Bridge in New York City. New York City’s old 1.9km Kosciuszko Bridge, which crosses Newtown Creek connecting Green Point, Brooklyn with Maspeth, Queens, has been out of service since April. By the end of the year, the polygonal Warren through-truss structure will be no more. To replace the old bridge, in 2009, the New York State Department of Transportation planned the construction of two cable-stayed replacement bridges.