Skip to main content

Canada's new bridge?

Plans are in hand in Canada for a replacement for the Pattullo Bridge.
February 29, 2012 Read time: 1 min
Plans are in hand in Canada for a replacement for the Pattullo Bridge. The current bridge link is ageing and a study has discounted a refurbishment of this structure as not being technically feasible. The bridge crosses the Fraser River and it is hoped that the replacement will be ready by 2020. Various alternatives have been evaluated and a new bridge is considered the most likely. The construction of a new six-lane bridge would cost US$1.03 billion. However, the new bridge might feature four lanes in a bid to cut costs. It is not yet clear whether the bridge would be tolled.

Related Content

  • New Californian bridge
    February 7, 2012
    Plans are in hand for a new bridge to replace the Gerald Desmond Bridge at the Port of Long Beach in California. The existing structure is not able to cope with anticipated increases in vehicle traffic volumes and is also too low for new generation of cargo ships to pass underneath.
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • Mobile River Bridge project proposed
    April 13, 2021
    A new proposal for the Mobile River Bridge project has been put forward.
  • Francis Scott Key Bridge demolition
    July 3, 2025
    Demolition is planned for the Francis Scott Key Bridge.