Skip to main content

Canada's new bridge?

Plans are in hand in Canada for a replacement for the Pattullo Bridge.
February 29, 2012 Read time: 1 min
Plans are in hand in Canada for a replacement for the Pattullo Bridge. The current bridge link is ageing and a study has discounted a refurbishment of this structure as not being technically feasible. The bridge crosses the Fraser River and it is hoped that the replacement will be ready by 2020. Various alternatives have been evaluated and a new bridge is considered the most likely. The construction of a new six-lane bridge would cost US$1.03 billion. However, the new bridge might feature four lanes in a bid to cut costs. It is not yet clear whether the bridge would be tolled.

Related Content

  • British Columbia decides on Massey Tunnel
    August 20, 2021
    Canada’s Pacific coast province of British Columbia has announced the George Massey Tunnel replacement will be another tunnel and not a bridge as decided earlier.
  • Fluor and ACS Infrastructure Canada win Gordie Howe Bridge deal
    October 2, 2018
    Bridging North America will build the Gordie Howe Bridge, named after a famous Canadian ice hockey player and leading scorer A partnership including Fluor Canada and ACS Infrastructure Canada has been chosen to design, build, finance, operate and maintain the Gordie Howe International Bridge project. The client, Windsor-Detroit Bridge Authority (WDBA), announced the appointment of Bridging North America group in the Canadian city of Windsor, across the Detroit River from Detroit in the US state of Michig
  • BC again eyes Massey Tunnel replacement
    December 21, 2020
    The aging 61-year-old Canadian tunnel is about 30km north of the US state of Washington.
  • Bidding for Uganda road connecting Kampala and Jinja
    May 22, 2018
    In Uganda bidding is now underway for the new expressway project to improve transport between capital Kampala and the industrial city of Jinja. The project for the 95km section of road is expected to cost US$1 billion to construct. The contract is being offered under the design, finance, build and operate model, with the route then being handed back to the Ugandan Government once the agreed concession period is complete. Some of the financing will be provided by the Africa Development Bank (AfDB), French De