Skip to main content

Canada: dump truck slams into bridge, partially demolishing it

In Canada, the driver of a dump truck that slammed into a pedestrian bridge, partially collapsing it on to road below, may have to pay for his mistake. Highway 132 in a suburb of Montreal was closed overnight while a demolition crew hastily tore down the remaining section of walkway over the road. Police are questioning the driver of the snow-removal dump truck who reportedly was travelling down the highway with his dumper raised, hitting the bridge which was built in 1979 and had recently undergone a US$
February 12, 2015 Read time: 2 mins

In Canada, the driver of a dump truck that slammed into a pedestrian bridge, partially collapsing it on to road below, may have to pay for his mistake.

Highway 132 in a suburb of Montreal was closed overnight while a demolition crew hastily tore down the remaining section of walkway over the road.

Police are questioning the driver of the snow-removal dump truck who reportedly was travelling down the highway with his dumper raised, hitting the bridge which was built in 1979 and had recently undergone a US$2.5 million renovation.

The provincial transport minister said he will be asking questions about who pays for the damages, saying in an interview there was nothing structurally wrong with the bridge and it was not meant to withstand vehicles slamming into it.

No one was seriously injured in the incident but the truck driver and the driver of a passing car that couldn’t avoid the rubble were taken to hospital and treated for shock, according to a report by the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Canadian Broadcasting Corporation Visit longueuil pedestrian overpass who will foot the bill to replace it Page false http://www.cbc.ca/news/canada/montreal/longueuil-pedestrian-overpass-who-will-foot-the-bill-to-replace-it-1.2952967 false false%>.

But the Montreal incident comes only two weeks after a similar but fatal accident in another part of the province of Quebec.

He said a similar accident involving a raised payload occurred a few weeks ago at an overpass in the Gatineau area, near the Canadian capital Ottawa. The truck driver wasn't wearing his seatbelt and was ejected from the vehicle. The bridge remained open but the roads were briefly closed following the incident.

Related Content

  • Wirtgen develops novel cutter wear system
    February 13, 2013
    Wirtgen’s novel inspection system offers a quick indication of wear rates on the cutting tools of the firm’s surface miners. Called the Wirtgen Pick Inspection (WPI) system, this tool comprises eight sensors that can make fast measurements and which are integrated into the cutting drum compartment of the surface miner. The sensors measure the degree of wear of the picks and the measuring process takes just one minute to complete, allowing it to carried out while changing trucks and reducing downtimes. The W
  • A sophisticated data communications system is offered by Trimble
    January 6, 2017
    Trimble says that its combined device for mobile communications and surveying data collection offers high performance and reliability. Called the Trimble Slate Controller, this rugged new unit is said to combine the convenience and ease-of-use of a smartphone with durability. Optimised for use with the Trimble Access field software and the Trimble R4 GNSS receiver, the Trimble Slate Controller supports a surveyor’s workflows. Offering voice, SMS text, and 3.75G cellular data transfer capabilities on GSM cel
  • A sophisticated data communications system is offered by Trimble
    March 8, 2013
    Trimble says that its combined device for mobile communications and surveying data collection offers high performance and reliability. Called the Trimble Slate Controller, this rugged new unit is said to combine the convenience and ease-of-use of a smartphone with durability. Optimised for use with the Trimble Access field software and the Trimble R4 GNSS receiver, the Trimble Slate Controller supports a surveyor’s workflows. Offering voice, SMS text, and 3.75G cellular data transfer capabilities on GSM cel
  • Bridge deck launched for the New Wear Crossing, Sunderland (Video)
    March 30, 2017

    The 300m bridge deck of Sunderland’s New Wear Crossing has been successfully launched across the river.

    The 4,750tonne concrete and steel deck was resting on the south side of the River Wear from where it was inched across to touch the north side in a 20-hour operation. It had to slide through the twin arched towers of the bridge’s double pylon on its way to its final position to connect the city regions of Pallion to the south and Castletown to the north.