Skip to main content

Canada: dump truck slams into bridge, partially demolishing it

In Canada, the driver of a dump truck that slammed into a pedestrian bridge, partially collapsing it on to road below, may have to pay for his mistake. Highway 132 in a suburb of Montreal was closed overnight while a demolition crew hastily tore down the remaining section of walkway over the road. Police are questioning the driver of the snow-removal dump truck who reportedly was travelling down the highway with his dumper raised, hitting the bridge which was built in 1979 and had recently undergone a US$
February 12, 2015 Read time: 2 mins

In Canada, the driver of a dump truck that slammed into a pedestrian bridge, partially collapsing it on to road below, may have to pay for his mistake.

Highway 132 in a suburb of Montreal was closed overnight while a demolition crew hastily tore down the remaining section of walkway over the road.

Police are questioning the driver of the snow-removal dump truck who reportedly was travelling down the highway with his dumper raised, hitting the bridge which was built in 1979 and had recently undergone a US$2.5 million renovation.

The provincial transport minister said he will be asking questions about who pays for the damages, saying in an interview there was nothing structurally wrong with the bridge and it was not meant to withstand vehicles slamming into it.

No one was seriously injured in the incident but the truck driver and the driver of a passing car that couldn’t avoid the rubble were taken to hospital and treated for shock, according to a report by the %$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 oLinkExternal Canadian Broadcasting Corporation Visit longueuil pedestrian overpass who will foot the bill to replace it Page false http://www.cbc.ca/news/canada/montreal/longueuil-pedestrian-overpass-who-will-foot-the-bill-to-replace-it-1.2952967 false false%>.

But the Montreal incident comes only two weeks after a similar but fatal accident in another part of the province of Quebec.

He said a similar accident involving a raised payload occurred a few weeks ago at an overpass in the Gatineau area, near the Canadian capital Ottawa. The truck driver wasn't wearing his seatbelt and was ejected from the vehicle. The bridge remained open but the roads were briefly closed following the incident.

Related Content

  • Euroswitch sensor achievement
    January 6, 2017
    Euroswitch is among those leading the way in the design and manufacture of level, pressure, temperature, speed and position sensors. The company says its mission is to develop high quality standard products and custom solutions supported by an efficient and flexible organisation with a highly skilled workforce.
  • Euroswitch sensor achievement
    April 5, 2013
    Euroswitch is among those leading the way in the design and manufacture of level, pressure, temperature, speed and position sensors. The company says its mission is to develop high quality standard products and custom solutions supported by an efficient and flexible organisation with a highly skilled workforce.
  • Pilosio exhibits its durable P300 formwork at bauma
    January 6, 2017
    Among Pilosio’s comprehensive range of formwork solutions on show at bauma will be the Italian firm’s P300 formwork. Used during the recent construction of a 560m overpass in Bucharest, Romania the P300 is said to be based on a 100x300cm base panel with a few simple accessories, such as a quick connection block to allow extremely rapid framework operations, and a varnished frame and surface counter-cast in 18mm thick, high resistance, multi-layered Finnish panels to ensure high number of uses.
  • Pilosio exhibits its durable P300 formwork at bauma
    February 15, 2013
    Among Pilosio’s comprehensive range of formwork solutions on show at bauma will be the Italian firm’s P300 formwork. Used during the recent construction of a 560m overpass in Bucharest, Romania the P300 is said to be based on a 100x300cm base panel with a few simple accessories, such as a quick connection block to allow extremely rapid framework operations, and a varnished frame and surface counter-cast in 18mm thick, high resistance, multi-layered Finnish panels to ensure high number of uses.