Skip to main content

Canada bridge deal

Technical investigations have highlighted structural issues with a bridge on a key bridge link on a highway in Quebec, Canada. The bridge on the 20 East highway close to the Pierre-Laporte exit in Lévis requires repair work. The bridge was built in 1965 and will be completely rebuilt so that a third lane can be added to the 20 East highway as far as the Président-Kennedy exit in Lévis. A contract has been awarded to Cima+-Dessau for the work, which is expected to commence in 2013.
April 26, 2012 Read time: 1 min
Technical investigations have highlighted structural issues with a bridge on a key bridge link on a highway in Quebec, Canada. The bridge on the 20 East highway close to the Pierre-Laporte exit in Lévis requires repair work. The bridge was built in 1965 and will be completely rebuilt so that a third lane can be added to the 20 East highway as far as the Président-Kennedy exit in Lévis. A contract has been awarded to Cima+-5686 Dessau for the work, which is expected to commence in 2013.

For more information on companies in this article

Related Content

  • Chinese contractor wins major Nigerian road project
    November 11, 2013
    A road construction contract worth US$1.07 billion has been awarded to China Railway Construction in Nigeria. The Ministry of Delta Affairs of Nigeria awarded the package of works for Section V of the A121 East-West highway to China Civil Engineering Construction, a division of China Railway Construction. The work is expected to take five years to complete and includes design as well as construction. When it is complete, the A121 will connect Nigeria’s two main North-South highways. Its route runs from the
  • A new highway for northern Colombia
    July 17, 2023
    The Pamplona-Cúcuta highway is playing an important role for the development of northern Colombia
  • Historic bridge damaged in flood opens in UK
    April 25, 2012
    The official reopening of a bridge badly damaged in the Cumbria floods has taken place. Bouthrey bridge, just off the A5084 between Water Yeat and Nibthwaite in South Lakeland, was severely damaged by the some of the heaviest rainfall ever recorded in England in November 2009. A temporary bridge was constructed as an interim measure and work began on repairing the main bridge.
  • New dual carriageway for South East Nigeria
    March 11, 2015
    Work is nearing completion on Nigeria’s important East-West road project. The new dual carriageway link should be ready to carry traffic in a matter of months. In all the project was originally expected to cost in the order of US$1.93 billion to construct and work commenced back in 2006. However an additional stretch may now be added that will extend the route. This project is of significance as it improves transport links to the South East of Nigeria, an area of the country that has long been overlooked fo