Skip to main content

Canada bridge deal

Technical investigations have highlighted structural issues with a bridge on a key bridge link on a highway in Quebec, Canada. The bridge on the 20 East highway close to the Pierre-Laporte exit in Lévis requires repair work. The bridge was built in 1965 and will be completely rebuilt so that a third lane can be added to the 20 East highway as far as the Président-Kennedy exit in Lévis. A contract has been awarded to Cima+-Dessau for the work, which is expected to commence in 2013.
April 26, 2012 Read time: 1 min
Technical investigations have highlighted structural issues with a bridge on a key bridge link on a highway in Quebec, Canada. The bridge on the 20 East highway close to the Pierre-Laporte exit in Lévis requires repair work. The bridge was built in 1965 and will be completely rebuilt so that a third lane can be added to the 20 East highway as far as the Président-Kennedy exit in Lévis. A contract has been awarded to Cima+-5686 Dessau for the work, which is expected to commence in 2013.

For more information on companies in this article

Related Content

  • Significant wins for Signify
    April 19, 2021
    Signify is transforming Gran Canaria’s most important highway, known as GC-1, into a smart highway with the company’s Interact City system
  • UK’s M6 tolled motorway for sale
    June 21, 2016
    For sale: one UK toll motorway along with operating business. Well maintained. Price negotiable. David Arminas looks at what is on offer As if right on cue, a French articulated truck starts to back up along the hard shoulder at an exit area of M6toll. The manoeuvring is watched from an office inside the nearby M6toll headquarters. Inside, Andy Pearson, chief executive of M6toll, glances over his shoulder and interrupts his presentation to World Highways. “He’s probably missed the dedicated wide-load
  • New bridge for Canada?
    March 5, 2012
    Plans may be changed for Canada's US$1 billion Patullo Bridge project.
  • Concession tender for Brazilian bridge
    December 8, 2014
    Brazil’s Transport Ministry is putting the concession contract to maintain the Rio-Niterói bridge in Rio de Janeiro out to tender. The present 20-year maintenance contract for the bridge held by Ponte will run out in May 31st 2015, reports Business News Americas. The new concession deal will involve maintaining the structure as well as building an underpass underneath Renascença square in Niterói. Construction of the 13.3km pre-stressed concrete structure commenced in 1968 and was completed in 1974, at whic