Skip to main content

Canada bridge deal

Technical investigations have highlighted structural issues with a bridge on a key bridge link on a highway in Quebec, Canada. The bridge on the 20 East highway close to the Pierre-Laporte exit in Lévis requires repair work. The bridge was built in 1965 and will be completely rebuilt so that a third lane can be added to the 20 East highway as far as the Président-Kennedy exit in Lévis. A contract has been awarded to Cima+-Dessau for the work, which is expected to commence in 2013.
April 26, 2012 Read time: 1 min
Technical investigations have highlighted structural issues with a bridge on a key bridge link on a highway in Quebec, Canada. The bridge on the 20 East highway close to the Pierre-Laporte exit in Lévis requires repair work. The bridge was built in 1965 and will be completely rebuilt so that a third lane can be added to the 20 East highway as far as the Président-Kennedy exit in Lévis. A contract has been awarded to Cima+-5686 Dessau for the work, which is expected to commence in 2013.

For more information on companies in this article

Related Content

  • Fire damage closes bridge over UK's M1 motorway
    February 22, 2012
    Following a fire at a scrapyard under the motorway (one of Britain’s busiest) in April, extensive investigation, assessment and structural reinforcement work has taken place non-stop.
  • VIDEO: Saskatoon bridge demolition removes final span
    November 18, 2016
    The final section of a defunct bridge in Saskatoon has now been removed by demolition contractor Rakowski Cartage & Wrecking. Excavators fitted with hydraulic breakers were employed by the firm to break up the final span, which collapsed into the river as planned. Demolition work to remove the defunct structure commenced in 2012. Other sections of the bridge were removed using explosive demolition earlier this year.
  • Houston, Texas is seeing fast expansion of population, with in vast increases in traffic
    October 9, 2018
    The US city of Houston is expanding fast and its transport system is having to be developed to cope
  • Managing urban motorway complexity in Sydney
    October 4, 2012
    Sydney’s Hills M2 motorway is being widened while still carrying traffic and meeting tough environmental criteria More than 100,000 vehicles and over 27,000 bus commuters use the Hills M2 motorway on a typical workday, making it one of Sydney’s busiest motorway corridors. Owned and managed by Hills Motorway Ltd (HML) and a key part of the city’s orbital motorway network, the road stretches over 21km, providing a seamless link between the Lane Cove Tunnel and Westlink M7. The Hills M2 Upgrade is one of many