Skip to main content

Canada bridge deal

Technical investigations have highlighted structural issues with a bridge on a key bridge link on a highway in Quebec, Canada. The bridge on the 20 East highway close to the Pierre-Laporte exit in Lévis requires repair work. The bridge was built in 1965 and will be completely rebuilt so that a third lane can be added to the 20 East highway as far as the Président-Kennedy exit in Lévis. A contract has been awarded to Cima+-Dessau for the work, which is expected to commence in 2013.
April 26, 2012 Read time: 1 min
Technical investigations have highlighted structural issues with a bridge on a key bridge link on a highway in Quebec, Canada. The bridge on the 20 East highway close to the Pierre-Laporte exit in Lévis requires repair work. The bridge was built in 1965 and will be completely rebuilt so that a third lane can be added to the 20 East highway as far as the Président-Kennedy exit in Lévis. A contract has been awarded to Cima+-5686 Dessau for the work, which is expected to commence in 2013.

For more information on companies in this article

Related Content

  • UK highway maintenance contract award
    October 5, 2018
    A major UK highway maintenance contract has been won by Balfour Beatty. The seven year deal is worth £103 million and was awarded by Telford and Wrekin Council for the maintenance of highways assets. The package also comes with an option to extend the contract for a further seven years. Balfour Beatty Living Places will work with the Council to maintain the Borough’s 1,002km of highways and 1,189km of footpaths, provide drainage cleansing services as well as winter gritting and reactive highways maintena
  • Implementation of road building projects in Russia’s Moscow may be significantly delayed
    May 15, 2014
    Implementation of some large-scale investment projects for road building in Russia’s capital Moscow may be significantly delayed A series of major documentation issues are the cause of the problem. These have delayed projects for up to nine tenders on the total sum of US$2.6 billion (95 billion rubles), with anomalies having been found by the Russian Federal Anti-Monopoly Service.
  • Holding back
    February 6, 2012
    AN INNOVATIVE slurry wall solution has been used by Bachy Soletanche at the Alderley Edge By-Pass project in the UK. Bachy Soletanche provided assistance for the A34 Alderley Edge by-pass project in the UK being carried out by main contractor Birse Civils. This solution was required to tackle challenges posed by the water table at the Welsh Row section. Bachy Soletanche used its experience with slurry cut-off walls, a technique rarely used in Britain on road construction, to benefit a tricky section of the
  • Egis Projects-Sanef consortium sign second major ORT operations contract in Canada
    April 4, 2012
    A consortium composed of Egis Projects and Sanef has signed a contract for the operation of the Port Mann Bridge open road tolling (ORT) project in the Metro Vancouver Area, Canada. The largest transportation infrastructure project in British Columbia history, it includes doubling the capacity of the bridge and widening the highway from Vancouver to Langley, a distance of 37km. Once complete, it will reduce travel times by up to 30%, and save drivers up to an hour a day. The new bridge will also provide for