Skip to main content

Canada bridge deal

Technical investigations have highlighted structural issues with a bridge on a key bridge link on a highway in Quebec, Canada. The bridge on the 20 East highway close to the Pierre-Laporte exit in Lévis requires repair work. The bridge was built in 1965 and will be completely rebuilt so that a third lane can be added to the 20 East highway as far as the Président-Kennedy exit in Lévis. A contract has been awarded to Cima+-Dessau for the work, which is expected to commence in 2013.
April 26, 2012 Read time: 1 min
Technical investigations have highlighted structural issues with a bridge on a key bridge link on a highway in Quebec, Canada. The bridge on the 20 East highway close to the Pierre-Laporte exit in Lévis requires repair work. The bridge was built in 1965 and will be completely rebuilt so that a third lane can be added to the 20 East highway as far as the Président-Kennedy exit in Lévis. A contract has been awarded to Cima+-5686 Dessau for the work, which is expected to commence in 2013.

For more information on companies in this article

Related Content

  • Work to restart on key Algerian highway section
    June 18, 2014
    Work looks set to restart on a key section of Algeria’s East-West highway. The country's national highways agency, the ANA, has issued the Japanese group Cojaal with a second formal request to restart work on a 359km section of the highway. Cojaal, along with the Chinese firm Citic-CRCC had been contracted to build 900km of the highway, which links the west of the country with the east. The Chinese section of the highway has been completed (although it was delayed) but Cojaal has yet to finish its section o
  • Braila Bridge in Romania inauguration
    June 27, 2023
    Romania’s landmark Braila Bridge link is having its official inauguration.
  • $238 million Florida road deal for Lane
    July 25, 2025
    Lane Construction has been awarded a $238 million Florida road project.
  • Maybe Hire takes on Whorlton Bridge
    March 14, 2025
    For refurbishment of the old English bridge, a temporary cable crane structure - designed by CaSE Civil & Structural Engineering - used a range of Mabey Hire’s propping equipment, including the Mass 50, System 160 and Mat 125 products.