Skip to main content

California highway project – report published

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the California Department of Transportation and the Los Angeles County Metropolitan Transportation Authority.
July 17, 2017 Read time: 1 min

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the 2451 California Department of Transportation and the 3227 Los Angeles County Metropolitan Transportation Authority. When the project is complete it will boost safety and cut congestion on SR-138 between the I-5 and SR-14 in the north of Los Angeles County. The area suffers heavily from traffic jams and delays are common for road users. The studies into the options available showed that the best alternative was for the expressway/limited access conventional highway. However the sections of SR-138 that will not be incorporated into the route improvements will now become local access roads.

The plan calls for a six-lane divided Freeway and Expressway running between the I-5 interchange to Gorman Post Road and from Gorman Post Road to 300th Street West. The plan also includes four-lane divided Expressway and Limited Access Conventional Highway from 300th Street West to 240th Street West and from 240th Street West to SR-14. However financing for the work has yet to be established.

Related Content

  • Final beam for Gerald Desmond Bridge replacement
    May 1, 2020
    The US$1.47 billion project was started in 2013 and open later this year.
  • Atkins is working on major deals for Texas and Florida
    March 10, 2014
    Atkins is working on major contracts in Texas and Florida for tolling and design and build services respectively. In Texas the Department of Transportation (TxDOT) reselected Atkins as its state-wide prime consultant for toll-plaza planning, development, and implementation. Under the terms of the five-year, $10 million contract, Atkins is providing planning, development, infrastructure design and coordination, and construction oversight services, as well as system installation, integration, and testing serv
  • LA’s Ribbon of Light viaduct cast into darkness
    January 10, 2024
    Thieves have been pulling copper wiring out of electrical boxes Los Angeles’ 6th Street Viaduct and selling it for scrap, prompting police to report that “the Grinch stole all the Christmas lights”.
  • Chile’s new urban highway link
    May 2, 2022
    Nestling in a valley beside the Andes mountain range, Santiago has a growing population and has suffered from increasingly heavy congestion in recent years, requiring a new urban road link for which safety has been set as a priority for drivers - *iRAP reports