Skip to main content

California highway project – report published

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the California Department of Transportation and the Los Angeles County Metropolitan Transportation Authority.
July 17, 2017 Read time: 1 min

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the 2451 California Department of Transportation and the 3227 Los Angeles County Metropolitan Transportation Authority. When the project is complete it will boost safety and cut congestion on SR-138 between the I-5 and SR-14 in the north of Los Angeles County. The area suffers heavily from traffic jams and delays are common for road users. The studies into the options available showed that the best alternative was for the expressway/limited access conventional highway. However the sections of SR-138 that will not be incorporated into the route improvements will now become local access roads.

The plan calls for a six-lane divided Freeway and Expressway running between the I-5 interchange to Gorman Post Road and from Gorman Post Road to 300th Street West. The plan also includes four-lane divided Expressway and Limited Access Conventional Highway from 300th Street West to 240th Street West and from 240th Street West to SR-14. However financing for the work has yet to be established.

Related Content

  • Israel's new tunnel project
    April 20, 2012
    The Israel National Roads Company is opening the tender process for the project to drive new tunnels on Road no 1.
  • India’s road to safety
    September 5, 2012
    India's growth rate is the envy of the world, and its infrastructure is rapidly improving, but its road safety record is the world's worst. Patrick Smith reports on a conference aimed at finding answers to the problems Ambling through the gardens and marble magnificence that is the Taj Mahal or gazing down on the city of Jaipur from the hilltop Jaigarh Fort is far removed from the world outside.
  • Stonehenge tunnel project being designed
    April 12, 2017
    Consultant AECOM is now working with Highways England on improvements to the busy A303 in the UK. The road upgrades will be carried out between Amesbury and Berwick South Down along a 13km section of the A303 route. AECOM will work with its supply chain partners Mace and Mouchel on the project. As the current alignment for the A303 passes just 165m from the Stonehenge World Heritage site (WHS), there is a strong need to redevelop the route so that it causes less harm to this important archaeological area. T
  • Morocco’s new motorway links are boosting connectivity
    December 16, 2014
    Morocco’s massive motorway construction programme will improve transport connections and boost this North African country’s economy - Mike Woof reports A massive road building programme is transforming Morocco, with new motorways connecting cities and major towns, as well as many new rural roads being built. The Moroccan Government has set an impressive plan for its infrastructure investment that will see even the country’s small and remote villages having proper connections to the main road network. The