Skip to main content

California highway project – report published

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the California Department of Transportation and the Los Angeles County Metropolitan Transportation Authority.
July 17, 2017 Read time: 1 min

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the 2451 California Department of Transportation and the 3227 Los Angeles County Metropolitan Transportation Authority. When the project is complete it will boost safety and cut congestion on SR-138 between the I-5 and SR-14 in the north of Los Angeles County. The area suffers heavily from traffic jams and delays are common for road users. The studies into the options available showed that the best alternative was for the expressway/limited access conventional highway. However the sections of SR-138 that will not be incorporated into the route improvements will now become local access roads.

The plan calls for a six-lane divided Freeway and Expressway running between the I-5 interchange to Gorman Post Road and from Gorman Post Road to 300th Street West. The plan also includes four-lane divided Expressway and Limited Access Conventional Highway from 300th Street West to 240th Street West and from 240th Street West to SR-14. However financing for the work has yet to be established.

Related Content

  • Zimbabwe highway project linking with its neighbours
    November 28, 2016
    Zimbabwe’s Beitbridge to Chirundu highway link now looks set for a complete upgrade. The project has been planned for over 10 years but has faced a series of setbacks and delays, with funding having proved one of the biggest stumbling blocks in the past. The 897km highway runs from Beitbridge, located on the border with South Africa in the south of Zimbabwe all the way up to Chirundu, which is just over the border with Zambia in the north. The route includes part of the A4 highway in the south and the A1 hi
  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    May 14, 2018
    The Canadian city’s replacement Champlain Bridge will open on schedule at the end of the year. Montreal, one of Canada’s largest cities, will have a well-earned Christmas present in December when the new Champlain Bridge opens after 42 months of construction. The new bridge, part of a six-lane 6km corridor including roads, is being built alongside the original bridge over the Saint Lawrence River and Seaway canal system. The new bridge, 3.4km long, runs from the île des Soeurs to Brossard, immediately dow
  • European Transport Safety Commission makes call for traffic safety boost
    July 10, 2015
    In 2013, 7,600 people died in road traffic while cycling or walking in European Union (EU) countries – the equivalent of a commercial airliner full of passengers being lost every week Because of this risk of death, the European Transport Safety Council (ETSC) wants vehicle manufacturers and local authorities to pay special attention to improving safety for cyclists, walkers and pedestrians. In a new report, the ETSC said the numbers being killed are falling more slowly than those for vehicle occupants. Over
  • Houston’s US$13 billion ‘gamechanger’ highway
    October 28, 2024
    Work is underway on Houston’s US$13 billion ‘gamechanger’ highway project.