Skip to main content

California highway project – report published

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the California Department of Transportation and the Los Angeles County Metropolitan Transportation Authority.
July 17, 2017 Read time: 1 min

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the 2451 California Department of Transportation and the 3227 Los Angeles County Metropolitan Transportation Authority. When the project is complete it will boost safety and cut congestion on SR-138 between the I-5 and SR-14 in the north of Los Angeles County. The area suffers heavily from traffic jams and delays are common for road users. The studies into the options available showed that the best alternative was for the expressway/limited access conventional highway. However the sections of SR-138 that will not be incorporated into the route improvements will now become local access roads.

The plan calls for a six-lane divided Freeway and Expressway running between the I-5 interchange to Gorman Post Road and from Gorman Post Road to 300th Street West. The plan also includes four-lane divided Expressway and Limited Access Conventional Highway from 300th Street West to 240th Street West and from 240th Street West to SR-14. However financing for the work has yet to be established.

Related Content

  • Rising to the challenge
    July 18, 2012
    Visualise today's concept of a major commercial traffic corridor in the western United States. A roadway responsible for delivering goods to Arizona, Nevada and Utah, that also connects Mexico to the United States to Canada through the North American Free Trade Agreement (NAFTA). What springs to mind? A multi-lane highway carrying thousands of vehicles a day past cities at speeds up to 113km/hour, while egress ramps make sure vehicles get safely to city streets and their final destination. This is not the c
  • Road pricing revenue a source of investment funds
    February 16, 2012
    When channelled back into the road sector, revenue from road charging is seen by many as a source of additional investment and research funds as Patrick Smith reports. Late in 2010, three major European organisations put out a policy statement calling for fair charging for greener, smarter and safer road infrastructure. ASECAP (the European toll road operators organisation); ERF (European Road Federation) and the IRU (International Road Transport Union), said that in recent years the concept of road chargin
  • Australia highway projects being planned
    November 24, 2015
    Key highway projects are progressing in Australia. In the state of Victoria, the authorities are planning a road widening project for the Monash Freeway that will cost an estimated US$289.54 million (A$400 million). The project calls for the route to be widened to five lanes in either direction for the stretch between the EastLink and the South Gippsland Highway.
  • Southern Ohio Veterans Memorial Highway ready for construction
    April 13, 2015
    Construction is about to start on the first public-private partnership highway project in the US state of Ohio. The Southern Ohio Veterans Memorial Highway, near the city of Portsmouth, will cost nearly US$228 million and is scheduled for completion in 2019, according to the Ohio Department of Transportation (ODOT). The Portsmouth Gateway Group will build the 25.8km, four-lane limited access highway from U.S. Route 23 north of Lucasville to U.S. Route 52 near Sciotoville. An ODOT statement said tha