Skip to main content

California highway project – report published

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the California Department of Transportation and the Los Angeles County Metropolitan Transportation Authority.
July 17, 2017 Read time: 1 min

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the 2451 California Department of Transportation and the 3227 Los Angeles County Metropolitan Transportation Authority. When the project is complete it will boost safety and cut congestion on SR-138 between the I-5 and SR-14 in the north of Los Angeles County. The area suffers heavily from traffic jams and delays are common for road users. The studies into the options available showed that the best alternative was for the expressway/limited access conventional highway. However the sections of SR-138 that will not be incorporated into the route improvements will now become local access roads.

The plan calls for a six-lane divided Freeway and Expressway running between the I-5 interchange to Gorman Post Road and from Gorman Post Road to 300th Street West. The plan also includes four-lane divided Expressway and Limited Access Conventional Highway from 300th Street West to 240th Street West and from 240th Street West to SR-14. However financing for the work has yet to be established.

Related Content

  • Lane, part of Salini Impregilo Group, wins I-440/US 1 deal in North Carolina
    October 26, 2018
    Lane Construction, the US subsidiary of Italy’s Salini Impregilo Group, has won a US$346 million design-build contract for the Interstate I-440/US 1 in North Carolina. Lane will be making improvements to the Interstate I-440/US 1 Wake County from south of Walnut Street to north of Wade Avenue. Around 10.5km of the highway - referred to locally as the Raleigh Beltline - will be widened from four lanes to six lanes. The work involves replacing pavement and bridges and upgrading interchanges and is expected
  • UK report suggests 30km Pennine tunnel with robotic maintenance
    December 2, 2015
    The UK could build one of Europe’s longest road tunnels as it considers route options for a new major link connecting the cities of Manchester and Sheffield in England. An interim report looking at how best to connect the cities suggested that the road could be between 40km-50km, depending on the route. It “will include a tunnelled section, which could range from between 20-30km, making it one of the longest road tunnels ever built”.
  • Addressing urban congestion with smart technology
    October 5, 2016
    A new generation of smart transport solutions could help cut congestion in urban areas around the world. The growth of personal vehicle ownership in developed and developing countries alike has exacerbated the problem of traffic congestion in many cities. Congestion is the bugbear of modern road transport, a sign of success and growing economies as well as a failure to anticipate demand. Building roads helps develop business and encourages economic growth, resulting in more traffic in the future. To quote K
  • Effective signage and road markings boost road safety
    February 24, 2012
    Effective signage and the use of roadmarkings in the most effective manner can reduce risks for all road users - Mike Woof writes