Skip to main content

California highway project – report published

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the California Department of Transportation and the Los Angeles County Metropolitan Transportation Authority.
July 17, 2017 Read time: 1 min

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the 2451 California Department of Transportation and the 3227 Los Angeles County Metropolitan Transportation Authority. When the project is complete it will boost safety and cut congestion on SR-138 between the I-5 and SR-14 in the north of Los Angeles County. The area suffers heavily from traffic jams and delays are common for road users. The studies into the options available showed that the best alternative was for the expressway/limited access conventional highway. However the sections of SR-138 that will not be incorporated into the route improvements will now become local access roads.

The plan calls for a six-lane divided Freeway and Expressway running between the I-5 interchange to Gorman Post Road and from Gorman Post Road to 300th Street West. The plan also includes four-lane divided Expressway and Limited Access Conventional Highway from 300th Street West to 240th Street West and from 240th Street West to SR-14. However financing for the work has yet to be established.

Related Content

  • The tender process for a key highway project in Nepal is opening
    October 15, 2019
    Tendering is opening for the consultation work for Nepal’s major Kathmandu-Terai/Madesh Expressway project. World Highways correspondent for Nepal, Ram Krishna Wagle, reports that the route will be designed to meet the Asian Highway Primary Class A standard. The work will review the previously completed detail engineering survey, detail design of expressway, the design of the expressway retaining structures, cross-drainage structures and drainage structures. It will also review river training structures, hi
  • Middle East financing for Moscow’s new toll route
    June 12, 2018
    Financing from the Middle East is helping to build the first toll road in Russia’s capital Moscow – Eugene Gerden reports. The first toll road within the Russian capital Moscow will be built this year with financing from a consortium comprising Russian and Arabian investors. This was revealed officially in a recent statement from the Moscow City Government. The heart of the project involves building a relief road for Kutuzovsky Prospekt, a major radial avenue in Moscow, which is known for its luxury stores
  • Flyover removal completed successfully
    February 15, 2021
    A flyover removal project has been completed successfully in the UK.
  • Toll-tale market strength for leading tolling manufacturers
    May 22, 2014
    New major highway tolling solution supply contracts and the launch of cutting-edge tolling products have invigorated the global tolling technology market in the first half of 2014, as Guy Woodford reports Kapsch TrafficCom has been selected by North Tarrant Express (NTE) Mobility Partners LLC to provide the toll collection, intelligent transport and network communication systems for the NTE extension project in the US state of Texas. The NTE extension is approximately 16km long, and runs along I-35W north o