Skip to main content

California highway project – report published

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the California Department of Transportation and the Los Angeles County Metropolitan Transportation Authority.
July 17, 2017 Read time: 1 min

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the 2451 California Department of Transportation and the 3227 Los Angeles County Metropolitan Transportation Authority. When the project is complete it will boost safety and cut congestion on SR-138 between the I-5 and SR-14 in the north of Los Angeles County. The area suffers heavily from traffic jams and delays are common for road users. The studies into the options available showed that the best alternative was for the expressway/limited access conventional highway. However the sections of SR-138 that will not be incorporated into the route improvements will now become local access roads.

The plan calls for a six-lane divided Freeway and Expressway running between the I-5 interchange to Gorman Post Road and from Gorman Post Road to 300th Street West. The plan also includes four-lane divided Expressway and Limited Access Conventional Highway from 300th Street West to 240th Street West and from 240th Street West to SR-14. However financing for the work has yet to be established.

Related Content

  • Study for Dallas road development project
    July 14, 2016
    The Texas Department of Transportation (TxDOT) awarded a US$2.75 million contract for a study to develop the corridor along a stretch of Interstate 635 (I-635) in Dallas. The two-year contract is for schematic, environmental and traffic studies for the construction of access roads along the growing section of highway and was awarded to Michael Baker International. As part of the contract, the Michael Baker team will conduct a number of detailed studies in advance of TxDOT’s plans to add more than 53km of
  • Award winning bridge for North Carolina
    November 21, 2019
    A new bridge in the US state of North Carolina has won a key award for excellence – Mike Woof writes
  • Slovakia opens up more D1 motorway sections to tender
    June 9, 2015
    Slovakia’s national motorway company NDS has put out to tender two sections of the D1 motorway near Presov and Kosice. Both tenders have been published in the Official Journal of the European Union, with bid submission deadlines set for June 29. The first section is the south-west D1 by-pass of Presov at nearly 8km long, including the construction of a 2km duel-tube road tunnel Presov and estimated to cost €443.4 million. The second section is the 14.5km-long D1 Budimir to Bidovce stretch, with cost
  • Substantial motorway expansion projects planned in Bavaria
    February 2, 2017
    The budget for Germany’s Motorway Directorate for Northern Bavaria will remain at around €520 million for 2017, according to media reports. For many years the budget for the Autobahndirektion Nordbayern (ADNB) was pegged between €320-380 million. This changed last year when it was boosted to €520 million, noted the newspaper Süddeutsche Zeitung. Substantial work is planned on the A3 and A6 motorways and on bridges. The 94km on the A3 between Aschaffenburg and Würzburg will be widened to six lanes by 2