Skip to main content

California highway project – report published

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the California Department of Transportation and the Los Angeles County Metropolitan Transportation Authority.
July 17, 2017 Read time: 1 min

The environmental impact report for California’s Northwest 138 Corridor Improvement Project has been completed. The report was produced jointly by the 2451 California Department of Transportation and the 3227 Los Angeles County Metropolitan Transportation Authority. When the project is complete it will boost safety and cut congestion on SR-138 between the I-5 and SR-14 in the north of Los Angeles County. The area suffers heavily from traffic jams and delays are common for road users. The studies into the options available showed that the best alternative was for the expressway/limited access conventional highway. However the sections of SR-138 that will not be incorporated into the route improvements will now become local access roads.

The plan calls for a six-lane divided Freeway and Expressway running between the I-5 interchange to Gorman Post Road and from Gorman Post Road to 300th Street West. The plan also includes four-lane divided Expressway and Limited Access Conventional Highway from 300th Street West to 240th Street West and from 240th Street West to SR-14. However financing for the work has yet to be established.

Related Content

  • New highway links spanning the Mississippi River
    August 9, 2017
    Construction work is now underway for new bridges carrying the I-74 Interstate highway across the Mississippi River between Iowa and Illinois in the Quad Cities area. The project forms part of a US$1 billion programme of works intended to cut congestion at peak periods along the route. This will improve traffic flow and reduce journey times for drivers. The project is being planned jointly by the Department of Transportation for Illinois and the Department of Transportation for Iowa. The highway bridges wil
  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.
  • New highway connection under construction in Hong Kong
    February 28, 2013
    Construction work is underway on the Central-Wan Chai Bypass in Hong Kong, a major project that will help tackle chronic traffic congestion. The Central-Wan Chai Bypass and Island Eastern Corridor Link is a section of the east-west route that runs along the north shore of Hong Kong Island. The project will help reduce traffic congestion along the Gloucester Road - Harcourt Road - Connaught Road Central corridor. The project is costing some US$3.62 billion (HK$28.1 billion) and the 4.5km long dual three-lane
  • Smart motorway project for UK’s M3
    July 23, 2014
    Balfour Beatty is to work on a €163.5 million (£129 million) upgrade project for a 21.4km stretch of the M3 motorway in the UK. The work involves upgrading the route to smart motorway status and is being carried out for the UK Government’s Highways Agency. This project will increase capacity, reduce congestion and shorten journey times for the 120,000 motorists/day using the route. This section of the motorway runs through the counties of Hampshire and Surrey, between Junction 2 which is interchange with th