Skip to main content

California bridge receiving constant attention

The MISTRAS Group is handling a US$3.4 million contract for continuous structural health monitoring on the San Francisco Oakland Bay Bridge. The client for this contract is the California Department of Transportation (CALTRANS) and MISTRAS will be responsible for installing and operating the package. The system is being installed on the bridge in response to a fatigue defect found on a structural steel beam in a regularly scheduled inspection during a holiday closure in 2009.
May 29, 2012 Read time: 2 mins
The 5774 MISTRAS Group is handling a US$3.4 million contract for continuous structural health monitoring on the San Francisco Oakland Bay Bridge. The client for this contract is the 2451 California Department of Transportation (CALTRANS) and MISTRAS will be responsible for installing and operating the package. The system is being installed on the bridge in response to a fatigue defect found on a structural steel beam in a regularly scheduled inspection during a holiday closure in 2009.

The bridge opened in 1936 and has one of the largest spans in the world, carrying some 250,000 vehicles/day at present. The MISTRAS system will remotely and continuously monitor 384 critical eye bars for the early detection of fatigue defects using its advanced real time software, listening to 640 strategically placed acoustic emission sensors mounted on the bridge's eye bars.

The package will automatically send a message alert to engineering personnel in the event of a flaw indication being detected, including its location. When delivered, this will possibly be the largest and most advanced automated structural health monitoring system in the world according to MISTRAS.

For more information on companies in this article

Related Content

  • Times they are a changing
    July 23, 2012
    Construction in China still appears to be on course for growth even with the gloomy economic outlook, as it enjoys "a strong budgets position." Patrick Smith reports One thing is certain in the current global economic climate: nothing is certain. And while China has not been unaffected by the economic events of recent months it has, according to Robert Zoellinck, president of the World Bank, a very strong current account and budgetary position. For some years, the nation has enjoyed double digit growth (the
  • Work zone safety with SRL's REMOS
    August 11, 2025
    REMOS allows one person off-site to manage several sites simultaneously, efficiently making interventions to prevent and eliminate bottlenecks.
  • New SF-Oakland Bay Bridge over budget and overdue
    July 22, 2013
    The project to replace the San Francisco-Oakland Bay Bridge is taking too long and is going over budget, according to California state officials. The officials claim US$1.28 billion had been spent for the replacement of the damaged eastern span by 2004, with the cost continue going up. A projected $20 million repair was announced on 10 July 2013 after the failure of 32 steel rods in stress tests. The 3.54km structure has yet to be completed after nearly 10 years. Cost projection has increased to roughly $6.
  • MAD about Vitronic in Germany
    April 30, 2025
    Vitronic has supplied two of its latest sensor columns to the project MAD Urban (Managed Automated Driving for Urban Mobility and Logistics) being set up in Braunschweig (Brunswick).