Skip to main content

Bypass route including road and bridge for Samara in Russia

A bypass project is being planned for Samara in Russia, with construction work due to commence shortly.
November 25, 2019 Read time: 1 min

The project will include the construction of a road section as well as a new bridge spanning the Volga River. Building the bypass is expected to cost US$1.82 billion. The bridge will measure 3.7km while the highway will be 90km in length. The work is due for completion in 2023 and the route will form part of the East-West corridor connecting Europe with China.

Related Content

  • Chinese highway projects being planned
    January 3, 2019
    A number of major road and bridge projects are now commencing in China. In Sichuan Province an environmental impact assessment report is being carried out for the Jigzhi-Barkam highway project. Work is starting shortly on the highway, which will stretch 224km and is expected to cost US$4.3 billion to construct. The report is being carried out by the province’s Ecology and Environment Agency. This new highway will provide many challenges to construction due to the topography of the route and will feature 190
  • Bangladesh bridge project for XCMG cranes
    March 7, 2018
    Six XCMG crawler cranes are working hard on the construction of the Padma Bridge in Bangladesh. This is a landmark project for Bangladesh, as the 6.15km structure will provide a new link between the south-west of the country and the northern and eastern regions. When the bridge is complete it will connect Louhajong, Munshiganj to Shariatpur and Madaripur. In addition to the main bridge section, there is an additional 3.8km approach bridge, which is also very important to the project. The Padma Bridge is
  • Nigeria’s coastal highway project
    March 10, 2025
    Work is starting for Nigeria’s coastal highway project.
  • Vietnam bridge, road and highway development projects
    June 20, 2018
    Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network. Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Pha