Skip to main content

Busy UK interchange on M1 motorway close to completion

Work on a busy interchange on the UK motorway network is close to completion. The new off-slip has opened at junction 24 of the M1 motorway. The work to upgrade junction 24 and junction 24a is being carried out by contractor Winvic Construction. The new off-slip at junction 24 provides a direct connection from the A50 eastbound to the M1 southbound. The work forms part of SEGRO’s Nationally Significant Infrastructure Project (NSIP) - SEGRO Logistics Park East Midlands Gateway (EMG) - a ground-breaking
August 28, 2018 Read time: 2 mins

Work on a busy interchange on the UK motorway network is close to completion. The new off-slip has opened at junction 24 of the M1 motorway. The work to upgrade junction 24 and junction 24a is being carried out by contractor Winvic Construction. The new off-slip at junction 24 provides a direct connection from the A50 eastbound to the M1 southbound. The work forms part of SEGRO’s Nationally Significant Infrastructure Project (NSIP) - SEGRO Logistics Park East Midlands Gateway (EMG) - a ground-breaking, multi modal ‘inland port’.

The changes to the road network are helping to facilitate a Rail Freight Interchange with Terminal, 11 modern industrial units, container storage and HGV park. Winvic is constructing all current elements and has also been appointed to build the four industrial units which are already under contract.

Further to the improvements made to the M1 motorway, a new junction has been created on the A453. It will provide access to SEGRO Logistics Park as well as connect the new Kegworth Bypass, which will reduce traffic flowing through the village. The new road infrastructure will also provide better access to Lockington via the local roads. Working in partnership with 8100 Highways England, which is also upgrading the M1 to a smart motorway between junctions 23a and 25, Winvic says it has kept disruption to road users to a minimum.

Winvic’s Project Manager, Mark Skelton, commented: “Winvic exceeds people’s expectations whenever possible, from clients, agencies and authorities to local residents and those who might only use a new road just once. The 700 acre EMG scheme is a challenge but Winvic’s ‘one-team’ ethos and its vast experience delivering infrastructure projects has enabled us to adhere to the programme and find creative-solutions. We’re happy to have delivered on time for the all the people who will benefit from the new highways layouts and junctions, and be one step closer to realising this economically beneficial ‘inland port’ for the UK.”

For more information on companies in this article

Related Content

  • Tarmac tyre trial on UK motorway
    August 7, 2019
    Highways England is carrying out trials of rubberised asphalt on a busy stretch of UK motorway. A section of the M1 near the city of Leicester has been repaved by contractor Tarmac, using a special asphalt mix containing crumb rubber from recycled motor vehicle tyres. Tarmac has developed the mix specially to meet tough requirements from Highways England. This trial will determine how the stretch of highway, located between junction 22 and junction 23, behaves in terms of running wear, skid resistance and
  • Amey: “First” UK carbon-neutral resurfacing
    February 15, 2021
    Amey Consulting said the recycled road surface has greater porosity than hot-rolled asphalt.
  • Tarmac goes low-carbon on UK’s A64
    December 20, 2024
    The trial was delivered on a 2.4km section of England’s A64 strategic highway, the eastbound carriageway at junction 44 near the town of Bramham in North Yorkshire county.
  • Driving recycling, unlocking the value of UK roads
    May 16, 2016
    Concerned about the risk of material failure, many local authorities and network operators have been reluctant to incorporate high recycled content asphalt into the surface course of UK roads. David Smith, development director at FM Conway, explained why asphalt recycling is crucial to maximising the value of Britain’s largely untapped road asset.