Skip to main content

Busy UK interchange on M1 motorway close to completion

Work on a busy interchange on the UK motorway network is close to completion. The new off-slip has opened at junction 24 of the M1 motorway. The work to upgrade junction 24 and junction 24a is being carried out by contractor Winvic Construction. The new off-slip at junction 24 provides a direct connection from the A50 eastbound to the M1 southbound. The work forms part of SEGRO’s Nationally Significant Infrastructure Project (NSIP) - SEGRO Logistics Park East Midlands Gateway (EMG) - a ground-breaking
August 28, 2018 Read time: 2 mins

Work on a busy interchange on the UK motorway network is close to completion. The new off-slip has opened at junction 24 of the M1 motorway. The work to upgrade junction 24 and junction 24a is being carried out by contractor Winvic Construction. The new off-slip at junction 24 provides a direct connection from the A50 eastbound to the M1 southbound. The work forms part of SEGRO’s Nationally Significant Infrastructure Project (NSIP) - SEGRO Logistics Park East Midlands Gateway (EMG) - a ground-breaking, multi modal ‘inland port’.

The changes to the road network are helping to facilitate a Rail Freight Interchange with Terminal, 11 modern industrial units, container storage and HGV park. Winvic is constructing all current elements and has also been appointed to build the four industrial units which are already under contract.

Further to the improvements made to the M1 motorway, a new junction has been created on the A453. It will provide access to SEGRO Logistics Park as well as connect the new Kegworth Bypass, which will reduce traffic flowing through the village. The new road infrastructure will also provide better access to Lockington via the local roads. Working in partnership with 8100 Highways England, which is also upgrading the M1 to a smart motorway between junctions 23a and 25, Winvic says it has kept disruption to road users to a minimum.

Winvic’s Project Manager, Mark Skelton, commented: “Winvic exceeds people’s expectations whenever possible, from clients, agencies and authorities to local residents and those who might only use a new road just once. The 700 acre EMG scheme is a challenge but Winvic’s ‘one-team’ ethos and its vast experience delivering infrastructure projects has enabled us to adhere to the programme and find creative-solutions. We’re happy to have delivered on time for the all the people who will benefit from the new highways layouts and junctions, and be one step closer to realising this economically beneficial ‘inland port’ for the UK.”

For more information on companies in this article

Related Content

  • Tenders open for England’s A66 northern trans-Pennine route
    October 31, 2019
    A €52 million contract to design the transformation of the A66 northern trans-Pennine route in England is now up for grabs, according to Highways England. A tender is open for dualling the remaining single carriageway sections of the A66 which links the M6 motorway at Penrith in Cumbria and the A1(M) motorway) at Scotch Corner in North Yorkshire. The formal notice for the A66 Preliminary Designer, Construction Technical Advisor and Supervision tender process has been published in the Official Journal of
  • Busy UK motorway junction demolished in tight time frame – Mark Anthony reports
    October 18, 2012
    Military-style planning and overwhelming demolition firepower ensured that Armac Group avoided financial penalties and the wrath of drivers on one of the UK’s busiest motorway intersections. Demolition & Dismantling reports. 6 January is traditionally known for the visit of the three wise men to Bethlehem. However, on 6 January 2012, three wise demolition engineers from Armac Group was tasked with dismantling the monumental structure known as Catthorpe Viaduct: the main overbridge of the M6/M1/A14 interc
  • Mott MacDonald picks up Highways England’s operations centre deal
    March 28, 2018
    Mott MacDonald will set up an asset management system as part of Highways England’s new technology operations centre. Under the T-TOC contract - Tools for the Technology Operations Centre – Mott MacDonald will work with Fujitsu which will develop a suite of software systems to monitor and manage electronic assets across Highways England’s network. Highways England has nearly 100,000 intelligent infrastructure devices across England’s strategic road network – trunk roads and motorways. T-TOC will enable a
  • Delta Bloc solution for major upgrade to UK’s M6 motorway
    February 8, 2018
    Delta Bloc’s structural precast concrete barriers have been supplied for a €308 million smart motorway project being undertaken by Highways England on the M6 Motorway. UK contractor Charcon Construction Solutions worked with Delta Bloc UK, which develops, manufactures, supplies and installs permanent and temporary concrete road safety barriers. The Highways England scheme between junction 16 at Crewe and junction 19 at Knutsford has seen a new 32km concrete safety barrier installed in the central reservat