Skip to main content

Bulgarian road deals being planned

A series of road rebuilding and improvement works is being planned in Bulgaria. A consortium will handle the €152.4 million contract to reconfigure a 30km stretch of road connecting Vidin with Botevgrad. The consortium is made up of the Bulgarian firms PST Sofia, PST Group, Nivel Stroy, PST Vidin, and Patengineering-M. Meanwhile the tendering process is open for the Barovo Bypass project, which is expected to be worth €136.6 million. This project is complex and includes building a 7.6km stretch of road, imp
November 1, 2019 Read time: 1 min

A series of road rebuilding and improvement works is being planned in Bulgaria. A consortium will handle the €152.4 million contract to reconfigure a 30km stretch of road connecting Vidin with Botevgrad. The consortium is made up of the Bulgarian firms PST Sofia, PST Group, Nivel Stroy, PST Vidin, and Patengineering-M. Meanwhile the tendering process is open for the Barovo Bypass project, which is expected to be worth €136.6 million. This project is complex and includes building a 7.6km stretch of road, improving a 2.9km road section and also building five tunnels, with a combined length of 4km. 

Related Content

  • Polish tunnel project receiving bids
    September 15, 2017
    Bids are now being received for an important tunnel project in northern Poland. The country’s General Directorate for National Roads and Motorways (GDDKiA) has had four offers worth between €194 million and €259 million for the construction of the tunnel. The new link is planned to be built in Swinoujscie and will run under the Swina River to Uznam Island with Wolin Island.
  • State-of-the art road tunnels in construction and use of ITS
    April 25, 2013
    A wealth of major road tunnel construction projects and significant cant ITS installations within existing key road tunnels have been recently completed or will soon be underway. Guy Woodford examines some of them. A state-of-the art Tunnel Boring Machine (TBM) - the 10th largest ever to be built worldwide will be put to work later this year on New Zealand Transport Agency’s landmark Waterview Connection project in Auckland. The giant Herrenknecht-manufactured machine will be used to construct the twin 2.5
  • Brazilian bridge being built
    March 23, 2015
    In Brazil the firm EcoRodovias has won the tender process for the Rio-Niteroi bridge contract. The Brazilian road management firm was awarded the tender for the Rio-Niteroi contract, with its proposed low charge for each user of the bridge. The company will take over management of the route from May 2015, for a period of 30 years. The tariff charged for light vehicles will immediately drop from the current US$1.61 (BRL 5.20) to $1.15 (BRL 3.70) when EcoRodovias takes over from CCR, which has the contract fo
  • Bolivia-Brazil bridge tender opening
    November 20, 2023
    The tender is opening for a new Bolivia-Brazil bridge link.