Skip to main content

Bulgarian road deals being planned

A series of road rebuilding and improvement works is being planned in Bulgaria. A consortium will handle the €152.4 million contract to reconfigure a 30km stretch of road connecting Vidin with Botevgrad. The consortium is made up of the Bulgarian firms PST Sofia, PST Group, Nivel Stroy, PST Vidin, and Patengineering-M. Meanwhile the tendering process is open for the Barovo Bypass project, which is expected to be worth €136.6 million. This project is complex and includes building a 7.6km stretch of road, imp
November 1, 2019 Read time: 1 min

A series of road rebuilding and improvement works is being planned in Bulgaria. A consortium will handle the €152.4 million contract to reconfigure a 30km stretch of road connecting Vidin with Botevgrad. The consortium is made up of the Bulgarian firms PST Sofia, PST Group, Nivel Stroy, PST Vidin, and Patengineering-M. Meanwhile the tendering process is open for the Barovo Bypass project, which is expected to be worth €136.6 million. This project is complex and includes building a 7.6km stretch of road, improving a 2.9km road section and also building five tunnels, with a combined length of 4km. 

Related Content

  • Bolivian link
    November 27, 2012
    A new road in Bolivia is planned to improve connections between Montero and Yapacani. A loan worth US$122 million for the project is being provided by the Inter-American Development Bank (IADB). Work on this four-lane road is being managed by Bolivia's road company ABC and the tender process is expected to open shortly. The 70km section of road will form part of the new Santa Cruz-Cochabamba highway. At present Bolivia's road network has a total length of 74,831km and this new highway project will help impr
  • Serbia upgrading infrastructure
    May 2, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci. So far some 180km of the Corridor 10 highway has been built over a 40 month time frame. A further 150km of the highway has still to be built. Work on the Corridor 10 motorway is also being financed by the European Bank for Reconstruction and Development and the state budget. Wh
  • Serbia upgrading infrastructure
    March 16, 2012
    Serbia has managed to reduce the cost of building the Corridor 10 highway by €80 million. These funds will instead be used to pay for upgrades and improvements needed for the second section of the highway project, close to Neradovci.
  • Poland: Budimex picks up S3 express road work near Lubin
    December 18, 2014
    The Polish construction consortium of Budimex and Ferrovial Agroman has won a tender to build a 22.6km section of the S3 express road between Silesian town of Legnica in the southwest and Lubin Poludiine, around 170km southeast of the capital Warsaw. The bid by the consortium, in which Budimex has a 95% stake, was nearly US$234 million and construction is expected to take 30 months. Ferrovial Agroman is the engineering and construction arm of Spanish infrastructure group Ferrovial. In early December,