Skip to main content

Building work starting on new Philippines toll road

Building work is starting shortly on a new toll road connection intended to boost transport and cut congestion in and around Manila in the Philippines. Manila is know for its heavy traffic congestion at peak periods and the 8km route will provide a new connection between the city’s north and south. This will be the second elevated expressway route.
October 29, 2019 Read time: 1 min

Building work is starting shortly on a new toll road connection intended to boost transport and cut congestion in and around Manila in the Philippines. Manila is know for its heavy traffic congestion at peak periods and the 8km route will provide a new connection between the city’s north and south. This will be the second elevated expressway route.

Related Content

  • New highway bridge for the Philippines
    October 20, 2022
    A new highway bridge link is planned for the Philippines.
  • Philippines toll road deal reached
    October 15, 2019
    The first three stretches of the Cavite-Laguna Expressway in the Philippines should be open to traffic by the end of October 2019. Around 10,000 vehicles/day are expected to use the three stretches when they open. The 45km route is costing US$653.4 million to develop. When it is fully commissioned in the second quarter of 2022, will cut journey times between CAVITEx and SLEx to 45 minutes, compared with 150 minutes that it has taken to travel previously. MPCALA Holdings has the concession package for the ro
  • Slow progress for Cameroon’s Yaoundé-Douala highway
    March 25, 2019
    Progress remains slow for the construction of the highway connecting Cameroon’s two largest cities, Douala and Yaoundé. The two cities are some 202km apart and the new route is intended to improve transport between Cameroon’s capital, Yaoundé, and its key commercial city and port, Douala. The existing National Road No3 linking the two cities currently suffers from heavy congestion and the new route will help alleviate the problem and cut journey times, boosting both capacity and safety. Around 30km of the
  • First concrete beam raised for new Mersey bridge link
    December 11, 2015
    The first concrete bridge beam for a junction on the new Mersey Gateway route has been lifted into place. Work is underway on a major road junction for the Mersey Gateway Project, with the first of 156 of the concrete beams has been lifted into place as work ramps up at a major road junction. A 550tonne capacity crane lowered the 106tonne beam into position at the Bridgewater junction in Runcorn, where the new Astmoor Bridgewater viaduct is being built over the Bridgewater canal. Two elevated slip roads ar