Skip to main content

Building the Pfänder tunnes

The second tube of the Pfänder Tunnel, Bregenz, Austria, where the new main tunnel has been excavated using a tunnel boring machine (TBM), is being constructed by Alpine BeMo Tunnelling. Tubbings have been installed as the inner tunnel lining, and as part of concreting for the inner shell, the FQ 1 crosscut, suitable for vehicles, is being constructed using a tunnel formwork carriage designed and supplied by PERI.
April 11, 2012 Read time: 2 mins
The high proportion of system components provided a cost-effective solution for the short tunnel structure
The second tube of the Pfänder Tunnel, Bregenz, Austria, where the new main tunnel has been excavated using a tunnel boring machine (TBM), is being constructed by Alpine BeMo Tunnelling.

Tubbings have been installed as the inner tunnel lining, and as part of concreting for the inner shell, the FQ 1 crosscut, suitable for vehicles, is being constructed using a tunnel formwork carriage designed and supplied by 298 PERI.

The existing Pfänder Tunnel, commissioned some 30 years ago, cannot cope with the increase in the traffic volumes, so the parallel, two-lane tube is being constructed. Over 14 months, the almost-12m diameter TBM drilled 6,600m through the Pfänder Mountains to form the main tunnel, which was lined with precast segments.

In case of fire, 31 connecting passageways between the old and new tunnel tubes for evacuation purposes are planned. For the most important, the 43.1m long FQ 1 crosscut, PERI created a tailored formwork solution consisting mainly of rentable VARIOKIT system components. The other crosscuts will have shotcreted inner shells.

A total of seven round-shaped wall formwork elements were prefabricated by PERI and supplied just-in-time to the construction site, thus minimising assembly time. After only 1.5 weeks of on site assembly, the construction tea

started work on the segments, with standard lengths of 5.9m. After a short period of introduction, a three day cycle could be achieved for these sections. Construction of the last two 3.35m long segments required two days respectively.

For more information on companies in this article

Related Content

  • Egypt’s canal tunnel project
    May 16, 2018
    Major progress is being achieved on Egypt’s key tunnel project, a link that runs underneath the Suez Canal.
  • Breakthrough for Slovenian Karavanke Tunnel
    April 2, 2024
    The existing tunnel Karavanke Tunnel tube between Austria and Slovenia opened in 1991.
  • Road and tunnel project eases Stockholm congestion
    February 23, 2012
    Part of the E20 European highway, the Norra länken aims to make a valuable contribution to easing congestion in central Stockholm. The construction of Norra länken is one of the biggest and most important road and tunnel projects being undertaken in Sweden, certainly in terms of scope and budget. It will be a link in the peripheral route around the Stockholm inner city area and be part of the E20 European Highway.
  • Tunnel construction in Italy using breakers
    August 10, 2018
    Hydraulic breakers from Indeco have helped with the excavation of a road tunnel in Italy. The HP 7000 and HP 5000 units from Indeco were used for excavation of a stretch of tunnel where blasting could not be used due to the proximity of live traffic. The Greppoli Tunnel is located between Grosseto and Siena in the section of road near Civitella Paganico on the SGC E 78. The route connects the Tyrrhenia coast with the Adriatic and is a major highway, connecting Grosseto to Fano. The 100m-long Greppoli Tunne