Skip to main content

Budget cuts affect Messina Straits bridge construction

A fresh set of problems has hit the long planned Messina Straits Bridge in Italy.
March 22, 2012 Read time: 2 mins

A fresh set of problems has hit the long planned Messina Straits Bridge in Italy. There is now reduced funding available for the project from the Italian Government. Some €1.6 billion that had originally been planned for this landmark project is now being used to pay for other infrastructure work, including the Naples-Bari, Foggia-Potenza and Messina-Catania railway. The Messina Straits Bridge project is being handled by a consortium comprising Italian contractor 3149 Impregilo and Spanish firm 3959 Sacyr. When this consortium was awarded the bridge project in 2005 the estimated cost of building the structure was some €4.4 billion. By the time the project was given the go-ahead in July 2011 the cost had spiralled to €8.5 billion.

Because the Italian interdepartmental committee for economic planning (CIPE) has used the €1.62 billion funding for other projects, the future of the Messina Straits Bridge is now in question. This move has been welcomed by environmental associations that are pushing for the Italian Government to reject the project. The Italian Government is considering cancelling all compensation payments agreed in the case of the contract being cancelled. Should the whole project be officially withdrawn, it is possible that no compensation would be paid. With Italy's economy struggling at present, there are questions as to whether the major investment required can be found. This much heralded structure is intended to provide a link between mainland Italy and the island of Sicily. However it has a chequered history that has seen the project being announced as going ahead and then being cancelled on more than one occasion.

For more information on companies in this article

Related Content

  • Rebuilding a historic bridge linking the US and Canada
    March 8, 2016
    While many road authorities in North America are finding it difficult to stretch their bridge assets beyond half a century, one bridge is closing in on its centenary - David Arminas reports The international Peace Bridge, connecting the Canadian province of Ontario with the US state of New York, is 88 years young this year, and still going strong.
  • Consortium wins third Bosphorus bridge deal
    December 3, 2012
    A consortium formed by ICTAS of Turkey and the Italian firm Astaldi has won a tender to build a third suspension bridge over Istanbul’s Bosphorus. Despite criticism from planners and environmentalists, the 1.3km structure, the longest over the strait, has been given the go-ahead by Turkey’s Transport Minister, Binari Yildirim. A joint venture of local company IC Içtas Insaat and Italian Astaldi has won the tender for the project, and Minister Yildirim is reported as saying the bridge would be built in three
  • UK Government finalising plans for Stonehenge road tunnel
    January 12, 2017
    The UK Government is finalising its plans for the construction of a road tunnel close to the famous Stonehenge monument in Wiltshire. The 2.9km tunnel will carry the A303, a busy road that carries heavy traffic, particularly during the holiday season when large numbers of tourists pass through the area. The existing route passes close to the Stonehenge monument but the road is widely recognised as being unfit for purpose. As well as carrying cars, it handles a high percentage of large trucks, including heav
  • Independent experts suggest interim Bay Bridge fix
    August 15, 2013
    The state Toll Bridge Program Oversight Committee (TBPOC) says it has received a report from the Federal Highway Administration (FHWA) in which the federal agency concludes that installing temporary seismic elements will make the new East Span of the San Francisco-Oakland Bay Bridge safe for traffic, and should be put in place as soon as possible. This FHWA plan involves inserting large steel plates, known as shims, into each of four bearings, improving their ability to safely distribute energy during an ea