Skip to main content

Brunei: Pulau Muara Besar Bridge nears completion

China Harbour Engineering said it expects to open Brunei’s four-lane Pulau Muara Besar Bridge by April. Pulau Muara Besar is a 955-hectare island project in Brunei Bay that includes a deep-sea container port development and industrial facilities. The project is designed to attract foreign investment in the country’s petrochemical and downstream oil and gas industries. The Pulau Muara Besar Bridge links the Brunei-Muara District in western Brunei and Pulau Muara Besar in eastern Brunei. The 27km 23m-wide
January 10, 2018 Read time: 1 min

China Harbour Engineering said it expects to open Brunei’s four-lane Pulau Muara Besar Bridge by April.

Pulau Muara Besar is a 955-hectare island project in Brunei Bay that includes a deep-sea container port development and industrial facilities. The project is designed to attract foreign investment in the country’s petrochemical and downstream oil and gas industries.

The Pulau Muara Besar Bridge links the Brunei-Muara District in western Brunei and Pulau Muara Besar in eastern Brunei.

The 27km 23m-wide bridge linking the island to Muara town is part of a larger 6km road scheme. The project cost was reported to be around 204 million, according to Brunei and Chinese media reports when it was announced in May 2015.

The development of power, communication and water pipeline networks, said Dong Yan, CHEC Brunei managing director, in an interview with Brunei media.

Related Content

  • Corridor for prosperity: The 5G Road
    June 14, 2019
    The next generation of highways will be a matrix of smart, intelligent and dynamic technologies that lower maintenance costs and ensure user safety. But challenges lie ahead, as Geoff Hadwick discovered in Dubrovnik The fifth-generation road is about to provide the world’s highway authorities with a big leap forward. This “forever-open”, self-healing road will integrate innovation into infrastructure, vehicles and entire intelligent transport systems, says Adewole Adesiyun, deputy secretary general of
  • Bosnia cancels a tender for Corridor 5C, part of European route E73
    March 13, 2017
    Bosnia is cancelling a tender for part of its Corridor 5C project, an integral part of the class-A north-south central European route E73. Route E73 runs around 700km from Hungary south through eastern Croatia to Bosnia and Herzegovina and the Adriatic Sea in the area of Ploče port. The longest part of this corridor goes through Bosnia and Herzegovina – nearly 340km. Director of the Bosnian motorways company Autoput FBiH, Adnan Terzic, confirmed the cancelled tender to the Bosnian daily newspaper Dnev
  • Metro Pacific pushes for Cebu-Mactan bridge in the Philippines
    January 19, 2015
    Metro Pacific Investments Corp (MPIC) is in discussions to form a joint venture for construction of a toll bridge connecting the islands of Mactan and Cebu in the Philippines. Cebu is an island province that incorporates 167 surrounding islands and islets, one of them being Mactan, which lies immediately off Cebu Island, across from Cebu City. MPIC’s subsidiary, Metro Pacific Tollways Development Corp (MPTDC), is proposing an 8.3km bridge costing around US$380 million, according to local media reports
  • Russian roads and bridges being planned
    April 22, 2020
    Russian road and bridge construction and maintenance works are being planned.