Skip to main content

Brunei: Pulau Muara Besar Bridge nears completion

China Harbour Engineering said it expects to open Brunei’s four-lane Pulau Muara Besar Bridge by April. Pulau Muara Besar is a 955-hectare island project in Brunei Bay that includes a deep-sea container port development and industrial facilities. The project is designed to attract foreign investment in the country’s petrochemical and downstream oil and gas industries. The Pulau Muara Besar Bridge links the Brunei-Muara District in western Brunei and Pulau Muara Besar in eastern Brunei. The 27km 23m-wide
January 10, 2018 Read time: 1 min

China Harbour Engineering said it expects to open Brunei’s four-lane Pulau Muara Besar Bridge by April.

Pulau Muara Besar is a 955-hectare island project in Brunei Bay that includes a deep-sea container port development and industrial facilities. The project is designed to attract foreign investment in the country’s petrochemical and downstream oil and gas industries.

The Pulau Muara Besar Bridge links the Brunei-Muara District in western Brunei and Pulau Muara Besar in eastern Brunei.

The 27km 23m-wide bridge linking the island to Muara town is part of a larger 6km road scheme. The project cost was reported to be around 204 million, according to Brunei and Chinese media reports when it was announced in May 2015.

The development of power, communication and water pipeline networks, said Dong Yan, CHEC Brunei managing director, in an interview with Brunei media.

Related Content

  • Environmentally friendly demolition of famous US Bay Bridge to take years
    March 18, 2013
    While the new eastern span of northern California’s Bay Bridge between San Francisco and Oakland will open to traffic this September, the task of taking down the old eastern bridge span roadway is likely to take years. Speaking to a local TV station Brad McCrea, regulatory director of the Bay Conservation and Development Commission, the state agency that oversees protection of the Bay Area, said: “Taking the old Bay Bridge [eastern span roadway] down is as practically as big a project as putting the new one
  • Auckland’s causeway project
    April 4, 2014
    When it is finished in early 2017, the causeway on Auckland’s North-western Motorway, State Highway 16, will have been raised 1.5m to stop flooding at extreme high tides. There will be four lanes city-bound and four/five lanes westbound with dedicated bus lanes in each direction, and the existing North-western cycleway that runs alongside it will be upgraded.
  • Increasing importance of alternate truck routes
    February 14, 2012
    The fabled Silk Route from China to Europe takes many forms, and is again becoming increasingly important as Patrick Smithreports The ancient Silk Road was never a single caravan route, but covered hundreds of kilometres in width extending in length for around 10,000km. This is the view of the European International Road Transport Union (IRU), and many other countries and organisations, who point out that it is a system of routes covering many countries via a series of branch roads that dates back some 2
  • Vital drainage and geosynthetics works in Mexico
    May 23, 2014
    A vital and novel highway drainage project in Mexico could provide the key to reducing the nation’s water scarcity, as Guy Woodford reports. A rare highway drainage project in downtown Monterrey, Mexico has created a sustainable blueprint for rainwater re-use that could help to tackle the country’s water scarcity problems.