Skip to main content

Bruce Highway in Australia sees upgrade

Plans are now in hand to upgrade and straighten the Bruce Highway over the Cardwell Ridge in Australia. The US$102.45 million (A$115 million) project will be handled jointly by a team comprising consulting engineer, SMEC Australia and Abigroup Contractors.
May 29, 2012 Read time: 1 min
RSSPlans are now in hand to upgrade and straighten the Bruce Highway over the Cardwell Ridge in Australia. The US$102.45 million (A$115 million) project will be handled jointly by a team comprising consulting engineer, 1326 SMEC Australia and 1362 Abigroup Contractors. The project is due for completion at the end of 2012 and the work includes realigning the highway to straighten out existing curves, building an overpass at the Rungoo railway crossing and adding extra lanes on gradients for slow moving heavy vehicles.

For more information on companies in this article

Related Content

  • New bridge is spanning China’s Yangtze River
    June 28, 2013
    There is massive development in design and construction of bridges in China and the Yingwuzhou Bridge over the Yangtze River is one key project – Mike Woof reports, with assistance from Route One’s Chinese publishing partner *CMTM Called the Mother River, the Yangtze is a focal point for China politically, economically and culturally. The river has been at the heart of China’s development for millennia, its history stretching back as far as the dawn of human civilisation. The name Yangtze, or Yangzi, is its
  • Major Necaxa-Tihuatlan Highway project for Mexico
    October 1, 2014
    A new highway in Mexico is connecting Necaxa with Tihuatlan and the project features challenging terrain - Mauro Nogarin reports In Mexico a landmark highway project is now close to completion, having set a number of records for Latin America.
  • Bechtel achieves tricky bridge replacement in tight timeframe
    March 21, 2012
    Contractor Bechtel has worked with Network Rail to complete a major road bridge upgrade in the UK. A construction team worked 104 hours consecutively to replace the bridge, located at Reading Station.
  • $303 million Lowell bridge replacement
    June 12, 2025
    Skanska is handling the $303 million Lowell bridge replacement in the US