Skip to main content

Bridge under discussion for UK’s River Thames

Engineering specialist AECOM will carry out a study into the proposed Lower Thames Crossing project in the UK.
June 19, 2012 Read time: 3 mins

Engineering specialist 1397 AECOM will carry out a study into the proposed Lower Thames Crossing project in the UK.

The contract was awarded by the 5432 Department for Transport and is to review the Lower Thames Crossing capacity options. AECOM’s task requires a range of technical skills including transport planning, highway engineering and environmental studies and is expected to take 12 months to complete. The Dartford River Crossing was first opened in 1963, a second tunnel followed in 1980 and the Queen Elizabeth Bridge became operational in 1991. The objective of this study is to help develop the longer-term strategy for the crossing. The study will consider options to provide additional river crossing capacity in the lower Thames area. It is intended the study will help inform public consultation on options during 2013.

The Lower Thames Crossing was proposed in 1989 in the Roads to Prosperity paper but this was then cancelled in the early 1990s. Three main options have been proposed in the past, all with locations to the east of the existing Queen Elizabeth Bridge. Two of these options would connect from an existing dual carriageway close to Tilbury on the north of the Thames and then take different routes to link with the A2/M2 to the south. One of these last options would also connect with the M20.

There are a range of factors to consider, including the fact that the routes would have to negotiate protected areas. The Lower Thames Crossing would also have to be designed so as not to impede flights to and from London City Airport. One of the earlier designs proposed the use of a concrete box girder bridge, which would feature a low profile and therefore not infringe on the flightpath for the airport. But the span required would have put the structure at the very limit of the technology available at the time using the concrete box girder bridge design. There were concerns over its structural strength, which were highlighted following a series of problems with wide span, concrete box girder bridges built along similar lines at the time. There were also criticisms that this comparatively cheap construction method would result in an ugly bridge that would be at odds with aesthetic sensitivities.

The design and construction techniques surrounding concrete box girder bridges have improved since the early 1990s and it seems feasible that such a structure featuring the required span might now be practical without sacrificing strength, capacity or design life. But it might still attract negative comment over its appearance and with approvals being a necessary part of its eventual construction, could well prove yet another barrier to the project. While cable-stayed bridges are favoured on grounds of aesthetics and also offer manageable costs if built along conventional lines, such a structure could intrude within the safety parameters for the flightpath into the airport. It was for this particular reason that the concrete box girder design was favoured over a cable-stayed alternative when the project was first put forward in the late 1980s. Another proposal has been to include the crossing as part of the proposed Thames Barrier but this may face further obstacles on various environmental grounds as well as cost issues.

Balancing all the factors for the project will be a complex task and AECOM is likely to put forward various options. At this stage however it seems likely that the concrete box girder option, however ugly, will be cheapest and simplest and with costs of any new transport connection under the spotlight due to the UK’s tough budgetary constraints, it will have a very strong case in its favour.

For more information on companies in this article

Related Content

  • Romania to tender for another A8 segment
    September 6, 2023
    The segment between Targu Mures and Targu Neamt could cost upwards of €6.35 billion.
  • New Zealand transport infrastructure works
    August 29, 2022
    New Zealand is to benefit from transport infrastructure works.
  • New Argentina-Uruguay bridge under discussion
    October 4, 2016
    A new bridge could be built to improve transport connections between Uruguay and Argentina. The project was discussed by the heads of state of both countries recently. The bridge would be constructed to connect Zarate in Argentina’s Buenos Aires Province with Nueva Palma, just over the border in Uruguay. The new bridge would provide a link from Argentina’s highway 12 with Uruguay’s highway 21, while the discussions have also included the possibility of the new crossing carrying rail lines in addition to roa
  • Ireland and Scotland link?
    March 1, 2018
    Politicians in Northern Ireland have again raised the prospect of bridge to link western Scotland the Irish island, according to media reports. The road and rail crossing as envisaged by the Democratic Union Party would cost close to €23 billion. It would run between the Irish town of Larne in County Antrim and the Dumfries and Galloway coastline in Scotland. The DUP said in its manifesto for the 2015 UK general election that there should be a feasibility study into building a bridge or tunnel.