Skip to main content

Bridge under construction collapses in Nepal

February 28, 2012 Read time: 1 min
A bridge under construction linking Bhoteodar and Bharate in Nepal's Lamjung District has collapsed. The bridge is located in Western Nepal and spans the Marsyangdi River. Work on the truss type bridge commenced in February 2009 and the structure has a span of 65m and is 4m wide. At the time of the collapse, 25 construction workers were at the site and three are posted as missing while two were injured and were taken to hospital for treatment. Officials at the western divisional road office in Damauli say that the cause of the collapse will be known following completion of a detailed investigation. The contractor involved in the project is Radha Construction.

Related Content

  • Turkey’s Bosporus bridge opening
    August 25, 2016
    Turkey’s Yavuz Sultan Selim Bridge over the Bosporus is having its official opening, which is being carried out by senior members of the country’s government including president Recep Erdoğan. The final sections of the deck structure were put into place in March 2016 and the project, which commenced in 2013, has been completed in record time. This is the third bridge to span the Bosporus at Turkey’s commercial centre, Istanbul and the new crossing will form part of the country’s North Marmara Highway pro
  • Colombia bridge project faces delays after collapse
    February 6, 2018
    The recent collapse of the Chirajara bridge continues to be a centre for controversy in Colombia. The enforced closure of the Bogota-Villavicencio road link following the collapse has caused transport problems and the Colombian Government has now ordered that the route be reopened before it causes further economic problems. Temporary measures are being carried out to allow vehicles, and trucks in particular, to be able to bypass the affected stretch safely. The road company Coviandes has commissioned an
  • India plans major infrastucture investment
    April 5, 2012
    India says it turned its Commonwealth Games into a world-class success, and now it aims to do the same with its infrastructure. Patrick Smith reports On October, 2010 India put itself on the world stage, and disaster appeared to loom as a catalogue of problems dogged its biggest ever sporting event. Costing nearly US$2 billion to stage, the most expensive Commonwealth Games ever were, according to some, in doubt. After years of planning some projects were incomplete, there were health scares and a br
  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.