Skip to main content

Bridge under construction collapses in Nepal

February 28, 2012 Read time: 1 min
A bridge under construction linking Bhoteodar and Bharate in Nepal's Lamjung District has collapsed. The bridge is located in Western Nepal and spans the Marsyangdi River. Work on the truss type bridge commenced in February 2009 and the structure has a span of 65m and is 4m wide. At the time of the collapse, 25 construction workers were at the site and three are posted as missing while two were injured and were taken to hospital for treatment. Officials at the western divisional road office in Damauli say that the cause of the collapse will be known following completion of a detailed investigation. The contractor involved in the project is Radha Construction.

Related Content

  • Cowi and Dissing+Weitling win Shenzhen and Zhongshan bridge deal
    April 18, 2016
    Engineering group Cowi and architecture firm Dissing+Weitling have won the tender for construction of a bridge and tunnel project to connect the Chinese cities of Shenzhen and Zhongshan. The US$5.51 billion 24km project in the southern province of Guangdong will include the world’s widest immersed road tunnel, two signature suspension bridges and two artificial islands. The road in the Pearl River Delta will have eight traffic lanes in two directions and a daily capacity of 90.000 cars, according to a
  • Rain storms destroy Beijing’s road surfaces
    August 17, 2012
    As heavy rain storms continue to batter the Chinese capital, Beijing, the number of collapsed road pavements has soared to record levels, according to the city's road and bridge maintenance authority. Since the start of the flooding on July 21 until mid-August, Beijing Municipal Bridge Maintenance Management Group, a State-owned business set up to repair the city’s bridges and roads, received nearly 300 emergency calls regarding collapsed road surfaces.
  • PPRS Nice 2018: maintenance moves mountains
    June 22, 2018
    Strategic maintenance was a major theme at the second Pavement Preservation and Recycling Summit in Nice, France. The world is changing, mobility is changing and so roads must change and adapt for the future.” With this brief statement, Jacques Tavernier opened the second PPRS Summit. “At the same time there is a growing awareness of poor or non-existent maintenance for highways. The question for this conference is how to adapt road maintenance in the face of this challenge,” said Tavernier, in his role as
  • VIDEO: Saskatoon’s Traffic Bridge demolished to make way for new bridge
    January 11, 2016
    A 100-year-old Parker truss bridge in western Canada had no official name until its 90th birthday, in 2007. Now, The Traffic Bridge – across the South Saskatchewan River in the city of Saskatoon - is no more, after its demolition earlier this month.

    The Traffic Bridge, nearly 6m wide and 290m long and took a year to build, and was Saskatoon’s first bridge across the river when it opened in 1907. The bridge was built by Winnipeg city-based John D. Gunn and Sons.