Skip to main content

Bridge under construction collapses in Nepal

February 28, 2012 Read time: 1 min
A bridge under construction linking Bhoteodar and Bharate in Nepal's Lamjung District has collapsed. The bridge is located in Western Nepal and spans the Marsyangdi River. Work on the truss type bridge commenced in February 2009 and the structure has a span of 65m and is 4m wide. At the time of the collapse, 25 construction workers were at the site and three are posted as missing while two were injured and were taken to hospital for treatment. Officials at the western divisional road office in Damauli say that the cause of the collapse will be known following completion of a detailed investigation. The contractor involved in the project is Radha Construction.

Related Content

  • Changing face of global construction industry
    February 28, 2012
    David CA Phillips reports on the changing structure of the global construction equipment industry. In 2007, the year of peak historical demand and before the onset of the international financial crisis, estimated total sales of key equipment types stood at just over 1,000,000 units, valued at approximately US$100 billion. By 2009 sales had fallen to around 600,000 units valued at around $65 billion. The consequences of the global financial recession were dramatic and immediate, and remain with us today, and
  • New methods for non-destructive concrete testing
    August 29, 2017
    How best is it possible to assess the state of concrete in a road pavement, bridge deck or tunnel wall? One of the most reliable ways is to take a core of concrete from the structure to analyse and test in the laboratory. One downside to this method is that doing the test creates weak points in the structure that must then be repaired. Another is that the frequency of such cores cannot be too great – so it is possible that some problem areas will be missed. New technologies from the world of geospatial eng
  • New bridges, ramp and tunnel for Dubai
    February 19, 2020
    New flyover bridges, a ramp and a tunnel connection are being built in Dubai.
  • US$4 billion bridge and highway project
    June 14, 2024
    A US$4 billion bridge replacement and highway upgrade project is planned for the US.