Skip to main content

Bridge under construction collapses in Nepal

February 28, 2012 Read time: 1 min
A bridge under construction linking Bhoteodar and Bharate in Nepal's Lamjung District has collapsed. The bridge is located in Western Nepal and spans the Marsyangdi River. Work on the truss type bridge commenced in February 2009 and the structure has a span of 65m and is 4m wide. At the time of the collapse, 25 construction workers were at the site and three are posted as missing while two were injured and were taken to hospital for treatment. Officials at the western divisional road office in Damauli say that the cause of the collapse will be known following completion of a detailed investigation. The contractor involved in the project is Radha Construction.

Related Content

  • Canada: dump truck slams into bridge, partially demolishing it
    February 12, 2015
    In Canada, the driver of a dump truck that slammed into a pedestrian bridge, partially collapsing it on to road below, may have to pay for his mistake. Highway 132 in a suburb of Montreal was closed overnight while a demolition crew hastily tore down the remaining section of walkway over the road. Police are questioning the driver of the snow-removal dump truck who reportedly was travelling down the highway with his dumper raised, hitting the bridge which was built in 1979 and had recently undergone a US$
  • Bridge engineering worldwide
    July 1, 2013
    Guy Woodford looks at vital bridge construction, repair and inspection projects in China, Europe, North America and Australia The Heron Road Bridge in Ottawa, Ontario in Canada is a vital link within the City’s transport network, as it crosses the Rideau River, which divides the east and west parts of the City. Constructed in 1966-1967, the Heron Road Bridge is approximately 275m long and includes six lanes.
  • Nepalese road and bridge route
    April 25, 2012
    The new steel-truss bridge linking Simikot in Nepal’s Humla district headquarters has now been inaugurated. The road will link Nepal with Hilsa in China and the bridge will span the Karnali River. This bridge will be completed within a year and the Nepalese Government will award the road construction to the Nepalese Army to speed work. The road was started 10 years ago but progress was slow and could not be completed due to insufficient budget. Helicopters will have to be used to carry some of the construct
  • The use of concrete cutting tools and tips for users
    October 8, 2015
    Despite the proven importance of identifying metal targets and electrical lines before cutting into concrete, every day there are stories about mishaps that happen when the necessary reconnaissance is not done. In this article, a few firms that provide concrete scanning services weigh in on the critical importance of locating embedded and or buried obstructions by scanning for these features using ground penetrating radar (GPR). Also offered are tips for selecting the best GPR equipment and best practices f