Skip to main content

Bridge under construction collapses in Nepal

February 28, 2012 Read time: 1 min
A bridge under construction linking Bhoteodar and Bharate in Nepal's Lamjung District has collapsed. The bridge is located in Western Nepal and spans the Marsyangdi River. Work on the truss type bridge commenced in February 2009 and the structure has a span of 65m and is 4m wide. At the time of the collapse, 25 construction workers were at the site and three are posted as missing while two were injured and were taken to hospital for treatment. Officials at the western divisional road office in Damauli say that the cause of the collapse will be known following completion of a detailed investigation. The contractor involved in the project is Radha Construction.

Related Content

  • Addressing a silent disaster
    September 24, 2012
    As India's economy registers 9% annual growth, promising material super-power status by mid-century, the nation is barely beginning to address a silent disaster, that of road casualties It was Dr. P K Sikdar [a director of International Consultants and Technocrats/ICT and a former director of the Central Road Research Institute/CRRI] who coined the phrase "silent disaster."
  • Terex Washing Systems set to launch new AggreSand system
    January 6, 2017
    Terex Washing Systems (TWS) is making final plans to unveil what it says is a new innovative washing system. The AggreSand system is the latest addition to what the company says is an already extensive product portfolio, and it is due to be officially launched in Quarter 2, 2013. The TWS AggreSand system combines aggregate washing and screening with sand processing on a modular chassis, and brings together “tried and trusted TWS components in an innovative modular design.”
  • Nigeria’s new Niger River crossing construction underway
    August 14, 2014
    Preparation work for the access roads to Nigeria’s new Niger River crossing has now commenced. Construction of the bridge itself looks likely to commence in 2015 and this long delayed project has been the subject of much scrutiny and comment within Nigeria. Contractor Julius Berger has the concession for the US$700 million bridge, which will carry both road and rail links. The site of the new bridge is close to the commercial city of Onitsha, which is a major transport hub for Nigeria. High volumes of throu
  • Nepal’s earthquake devastation revealed
    April 30, 2015
    Reports from Nepal highlight the devastation the country has suffered due to its recent massive earthquake. Measuring an enormous 7.8 on the Richter scale, the quake has demolished many buildings in capital Kathmandu, as well as damaging roads and other infrastructure. This was followed by a series of aftershocks, one of which measured 6.7 on the Richter scale. World Highways correspondent Ram Krishna Wagle reports that with many road links to other towns severely damaged, this is hampering the relief eff