Skip to main content

Bridge spanning Nepal’s Bagmati River open to traffic

The bridge linking Old Baneshwor and Sinamangal over the Bagmati River in Nepal’s capital Kathmandu has now been officially opened. This was carried out by the former minister for Physical Planning and Transport although the bridge itself had been open to traffic for five months prior to the inauguration. The old bridge had to be closed after one of the piers subsided in September 2009, a common problem for bridges in Nepal. The Nepalese Government has initiated the new bridge in January 2010. There have be
April 3, 2014 Read time: 1 min
The subsidence in the old Bagmati River Bridge on the left of the image can be seen clearly and resulted in the structure being closed to traffic
The bridge linking Old Baneshwor and Sinamangal over the Bagmati River in Nepal’s capital Kathmandu has now been officially opened. This was carried out by the former minister for Physical Planning and Transport although the bridge itself had been open to traffic for five months prior to the inauguration. The old bridge had to be closed after one of the piers subsided in September 2009, a common problem for bridges in Nepal. The 5283 Nepalese Government has initiated the new bridge in January 2010. There have been issues regarding the time needed to open the new bridge, which was initially expected to take only 18 months to build but actually took four years. The bridge is 40m long by 9m wide and features a two span design and replaces the earlier structure completed in 1965.

For more information on companies in this article

Related Content

  • Kathmandu flyover opening
    June 26, 2025
    A new Kathmandu flyover is open to traffic, forming part of the city’s ring road.
  • Washington DC’s historic bridge replacement project
    June 11, 2019
    The project to replace a historic bridge in US capital Washington DC is providing major challenges for its builders - Mike Woof writes
  • Nepal’s road safety awareness programme is now commencing
    April 12, 2013
    A half day seminar has been run in Nepal with aim of reducing road fatalities. The seminar focussed on the Role of Roads Board Nepal in creating road safety awareness. This event was set up by the Road Board Nepal, a government agency established under the Road Board Act 2002. The agency has the aim of providing a sustainable fund for planned maintenance of the roads in association with local NGOs; Nepal Forum for Rural Transport and Development (NFRTD) and Nepal Road Safety Society. Engineer Ramesh Bastola
  • New bridge is spanning China’s Yangtze River
    June 28, 2013
    There is massive development in design and construction of bridges in China and the Yingwuzhou Bridge over the Yangtze River is one key project – Mike Woof reports, with assistance from Route One’s Chinese publishing partner *CMTM Called the Mother River, the Yangtze is a focal point for China politically, economically and culturally. The river has been at the heart of China’s development for millennia, its history stretching back as far as the dawn of human civilisation. The name Yangtze, or Yangzi, is its